14 Flood Projects found

Tags: Walgett

Filter Results
  • Flood Project
    Guidance, Tools and Resources

    Namoi Catchment - Water Resources and Management Overview

    Completed
    Publication date: 01/02/2011
    The Namoi River is one of the Murray-Darling Basin's major NSW sub-catch merits. It covers an area of about 42,000 km from the Great Dividing Range near Tamworth to the Barwon...

  • Flood Project
    Guidance, Tools and Resources

    Namoi Wetlands - Assessment and Prioritisation Project

    Completed
    Publication date: 01/09/2008
    The Namoi catchment is located in the north-west slopes and plains of New South Wales and lies within the northern region of the Murray-Darling Basin. The catchment has an area...

  • Flood Project
    Floodplain Risk Management Study

    Moomin Creek Floodplain Management Study

    Completed
    Publication date: 01/05/2006
    This floodplain management study is concerned with the floodplain of Moomin Creek. The FMP area stretches approximately 80 km along Moomin Creek from upstream of the Gurley...

  • Flood Project
    Floodplain Risk Management Plan

    Flood Management Options for Walgett (Draft)

    Completed
    Publication date: 01/10/2003
    The town of Walgett which is located on the Namoi River near its confluence with the Barwon River is protected from flooding by an 8.7km long levee system which surrounds the...

  • Flood Project
    Flood study

    Moomin Creek Flood Study

    Completed
    Publication date: 01/09/2003
    This floodplain management study is concerned with the floodplain of Moomin Creek. The study area is located within a designated floodplain and stretches approximately 80 km...

  • Flood Project
    Flood study

    Coonamble Flood Scoping Study

    Completed
    Publication date: 01/12/2002
    This study was commissioned by the Department of Land and Water Conservation (DLWC) to review the issues associated with flooding at Coonamble, NSW. It is funded through...

  • Flood Project
    Flood study

    Macquarie River Floodplain Management Study (Narromine to Oxley Station) -...

    Completed
    Publication date: 01/09/2002
    The objective of the study is to assist the community to co-ordinate floodplain development in order to minimise flood risk to occupiers and users of the floodplain whilst...

  • Flood Project
    Floodplain Risk Management Study

    Macquarie Floodplain Management Study - Phase A Report (FINAL DRAFT)

    Completed
    Publication date: 01/07/2002
    The objective of the study is to assist the community to co-ordinate floodplain development in order to minimise flood risk to occupiers and users of the floodplain whilst...

  • Flood Project
    Floodplain Risk Management Study

    Macquarie Floodplain Management Study - Phase A Report - Environmental Section Draft

    Completed
    Publication date: 01/05/2002
    As part of the study commissioned by the Department of Land and Water Conservation (DLWC) and the Macquarie Rural Floodplain Management Committee, a collation of environmental...

  • Flood Project
    Guidance, Tools and Resources

    Barwon-Darling River Floodplain Management - Walgett to Bourke - Final...

    Completed
    Publication date: 01/01/2001
    This scoping study has been undertaken with the following aims: to collate available data on flood behaviour, existing development, and significant flood dependent ecosystems on...

  • Flood Project
    Guidance, Tools and Resources

    Barwon-Darling River - Walgett to Bourke - Floodplain Management - Working...

    Completed
    Publication date: 01/12/1999
    A review of current rural floodplain management practice in New South Wales by the Department of Land and Water Conservation (DLWC) has indicated the need for a change in...

  • Flood Project
    Guidance, Tools and Resources

    Narrabri West to Walgett Line - Renewal of Wee Waa Lagoon Underbridge at...

    Completed
    Publication date: 01/02/1998
    The section of the Narrabri West to Waigett railway line between 594 km and 612 km crosses the Namoi River floodplain in the vicinity of the town of Wee Waa. The line is very...

  • Flood Project
    Geotech Report on levee

    Brewarrina Levees Upgrading - Preliminary Design Report (Draft)

    Completed
    Publication date: 01/02/1998
    Brewarrina Shire Council and the Department of Land and Water Conservation are proposing to upgrade and improve the existing levee bank protection for the town of Brewarrina and...

  • Flood Project
    Visual Levee Audits

    Audit of Flood Levees for New South Wales - Town of Walgett

    Completed
    Publication date: 01/04/1992
    The town of Walgett, which is located on the Namoi River near its confluence with the Barwon River, has a population of about 2,600. It is protected from flooding by a ring...