-
Flood ProjectFloodplain Risk Management Study and Plan
Tarcutta, Ladysmith and Uranquinty Floodplain Risk Management Studies and Plans
CompletedPublication date: 18/06/2021This report describes the data collection, model update, flood risk assessment and mitigation measures assessment of the Tarcutta, Ladysmith & Uranquinty Floodplain Risk...
-
Flood ProjectFloodplain Risk Management Study and Plan
Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and Plan
CompletedPublication date: 13/04/2018Wagga Wagga is located in the Riverina region of NSW. The study area is subject to flooding from the Murrumbidgee River. The Murrumbidgee River traverses the floodplain from...
-
Flood ProjectFlood study
Narrandera Flood Study Review and Levee Options Assessment
CompletedPublication date: 01/10/2015Narrandera is located on the Murrumbidgee River approximately 140 km downstream of the regional centre of Wagga Wagga. Most of the developed area of the town is located on...
-
Flood ProjectPost event flood behaviour reports
Murrumbidgee River - Flood Modelling 2012
CompletedPublication date: 31/01/2012The Wagga Wagga Local Government Area (LGA) is located in the southern inland area of NSW. The study area is surrounded by seven other LGAs, namely Coolamon and Junee to the...
-
Flood ProjectPost event flood behaviour reports
Murrumbidgee River - Flood Modelling
CompletedPublication date: 26/09/2011The Wagga Wagga Local Government Area (LGA) is located in the southern inland area of NSW. The study area (depicted in Figure 1) is surrounded by seven other LGAs, namely...
-
Flood ProjectPost event flood behaviour reports
Review of water management during the 2010 flood events in the Tumut River an...
CompletedPublication date: 01/08/2011The Murrumbidgee River rises on the Monaro Plateau. The river initially flows southeast then turns north near Cooma and swings north-northwest through the ACT before entering...
-
Flood ProjectFloodplain Risk Management Study
Narrandera Floodplain Risk Management Study
CompletedPublication date: 30/03/2009There is a long history of flooding from the Murrumbidgee River in Narrandera. Serious flooding has been reported since settlement began over 150 years ago. Formal gauging of...
-
Flood ProjectFloodplain Risk Management Plan
Narrandera Floodplain Risk Management Plan
CompletedPublication date: 27/03/2009There is a long history of flooding from the Murrumbidgee River in Narrandera. Serious flooding has been reported since settlement began over 150 years ago. Formal gauging of...
-
Flood ProjectFlood study
Murrumbidgee River Flood Mitigation Study
CompletedPublication date: 01/11/1977This study was commissioned by the Water Resources Commission in December 1976 as the first phase of a comprehensive study to establish needs for flood mitigation measures,...
-
Flood ProjectFlood study
Lower Burkes Creek - Flood Mitigation Scheme
CompletedPublication date: 01/01/1111This report has been prepared for issue to landholders on the flood plain of Burkes Creek downstream of about The Rock in an area where earthworks associated with development...