1 Flood Project found

Tags: Tweed River CBD levee River Basin: 201 - Tweed Organisations: Tweed Shire Council

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Murwillumbah CBD Levee & Drainage Study

    Completed
    Publication date: 22/08/2018
    A study to better define flooding and drainage behaviour within the CBD associated with local catchment runoff as well as levee overtopping. A key objective of the study was to...