6 Flood Projects found

Tags: Tweed River River Basin: 201 - Tweed Organisations: Tweed Shire Council

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Murwillumbah CBD Levee & Drainage Study

    Completed
    Publication date: 22/08/2018
    A study to better define flooding and drainage behaviour within the CBD associated with local catchment runoff as well as levee overtopping. A key objective of the study was to...

  • Flood Project
    Flood study

    Tweed Valley -2009 Flood Study Update

    Completed
    Publication date: 19/12/2009
    Tweed Shire Council was one of the first Councils in New South Wales to undertake flood studies for the purposes of defining planning controls and determining the impact of...

  • Flood Project
    Guidance, Tools and Resources

    Tweed Valley - Floodplain Risk Management Policy

    Completed
    Publication date: 18/12/2007
    This policy establishes Council’s framework for management of the existing, future and continuing flood risk for property affected by flooding within the Tweed Shire. The policy...

  • Flood Project
    Guidance, Tools and Resources

    East Murwillumbah & William/Dorothy Streets, Murwillumbah - Floodplain...

    Completed
    Publication date: 01/08/1999
    This report has been prepared for Tweed Shire Council and investigates floodplain management options for the East Murwillumbah and William/Dorothy Streets Area of the...

  • Flood Project
    Guidance, Tools and Resources

    The Impact of Storm Setup on Estuary Flooding - The Tweed Experience in 1984

    Completed
    Publication date: 01/04/1986
    "During April 1984, a severe storm in the region caused flooding on the lower Tweed River. The Water Research Laboratory (acting through Unisearch Ltd) was commissioned to...

  • Flood Project
    Guidance, Tools and Resources

    New Barneys Point Bridge With Interim Roadway - Flood Simulations

    Completed
    Publication date: 01/11/1984
    A mathematical flood model of Chinderah was used to simulate the occurrence of a design 1 in 100 year flood for conditions after the proposed bridge construction. The details of...