11 Flood Projects found

Tags: Tweed River

Filter Results
  • Flood Project
    Post event flood behaviour reports

    Post 2022 Event Flood Behaviour Analysis Tweed River -Report Only

    Completed
    Publication date: 01/03/2024
    The Tweed River experienced flooding on 28 February 2022, with river levels exceeding the March 2017 highest peak on record for Mullwillumbah, Uki and Tumblegum. Flood waters...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Murwillumbah CBD Levee & Drainage Study

    Completed
    Publication date: 22/08/2018
    A study to better define flooding and drainage behaviour within the CBD associated with local catchment runoff as well as levee overtopping. A key objective of the study was to...

  • Flood Project
    Post event flood behaviour reports

    NSW North Coast Flood Summary January-March 2013

    Completed
    Publication date: 31/05/2013
    This report presents water level, wave and rainfall hydrometric data collected during the January to March 2013 flood events in the north and mid-north coast of NSW. Data...

  • Flood Project
    Flood study

    Richmond River Flood Mapping Study

    Completed
    Publication date: 27/04/2010
    Located within the Northern Rivers region of New South Wales, the Richmond River catchment covers an area of approximately 6,900 square kilometres. The catchment is bound by the...

  • Flood Project
    Flood study

    Tweed Valley -2009 Flood Study Update

    Completed
    Publication date: 19/12/2009
    Tweed Shire Council was one of the first Councils in New South Wales to undertake flood studies for the purposes of defining planning controls and determining the impact of...

  • Flood Project
    Guidance, Tools and Resources

    Tweed Valley - Floodplain Risk Management Policy

    Completed
    Publication date: 18/12/2007
    This policy establishes Council’s framework for management of the existing, future and continuing flood risk for property affected by flooding within the Tweed Shire. The policy...

  • Flood Project
    Floodplain Risk Management Study

    Mid-Richmond Floodplain Risk Management Study (Exhibition Copy Vol 1 of 2)

    Completed
    Publication date: 25/10/2002
    The Richmond River is one of New South Wales’ largest coastal rivers. The upper reaches flow in a general north-south direction from its source on the Queensland / New South...

  • Flood Project
    Floodplain Risk Management Plan

    Mid-Richmond Floodplain Risk Management Plan (Exhibition Copy)

    Completed
    Publication date: 25/10/2002
    The Richmond River is one of New South Wales’ largest coastal rivers. The upper reaches flow in a general north-south direction from its source on the Queensland / New South...

  • Flood Project
    Guidance, Tools and Resources

    East Murwillumbah & William/Dorothy Streets, Murwillumbah - Floodplain...

    Completed
    Publication date: 01/08/1999
    This report has been prepared for Tweed Shire Council and investigates floodplain management options for the East Murwillumbah and William/Dorothy Streets Area of the...

  • Flood Project
    Guidance, Tools and Resources

    The Impact of Storm Setup on Estuary Flooding - The Tweed Experience in 1984

    Completed
    Publication date: 01/04/1986
    "During April 1984, a severe storm in the region caused flooding on the lower Tweed River. The Water Research Laboratory (acting through Unisearch Ltd) was commissioned to...

  • Flood Project
    Guidance, Tools and Resources

    New Barneys Point Bridge With Interim Roadway - Flood Simulations

    Completed
    Publication date: 01/11/1984
    A mathematical flood model of Chinderah was used to simulate the occurrence of a design 1 in 100 year flood for conditions after the proposed bridge construction. The details of...