4 Flood Projects found

Tags: Tuppal Creek Bullatale Creek River Basin: 409 - Murray Riverina

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Edward River at Deniliquin Floodplain Risk Management and Plan

    Completed
    Publication date: 28/04/2017
    The Edward River is located in the Riverina region in the south-west of New South Wales. The River is an anabranch of the Murray River, breaking off at Picnic Point and then...

  • Flood Project
    Flood study

    Edward River at Deniliquin Flood Study

    Completed
    Publication date: 13/11/2014
    The Edward River is located in the Riverina region in the south-west of New South Wales. The River is an anabranch of the Murray River, running parallel to it for approximately...

  • Flood Project
    Floodplain Risk Management Plan

    Tuppal & Bulltale Creeks - Floodplain Management Plan

    Completed
    Publication date: 01/05/2004
    The Tuppal and Bullatale Creeks FMP has been prepared to replace the 1978 Guidelines. The FMP will serve as the future basis for the management of the Tuppal and Bullatale...

  • Flood Project
    Flood study

    Tuppal and Bullatale Creeks: Data Collection and Flood Study

    Completed
    Publication date: 01/03/2002
    The Tuppal and Bullatale Creeks Data Collection and Flood Study represents the first phase (Phase A) in the preparation of a Floodplain Management Plan for the Murray River...