Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

8 Flood Projects found

Tags: Tocumwal

Filter Results
  • Flood Project
    Floodplain Risk Management Plan

    Wakool River Moama-Moulamein Railway to Gee Gee Bridge - Floodplain Managemen...

    Completed
    Publication date: 01/01/2011
    This Stage 2 floodplain management plan (Stage 2 FMP) has been prepared to provide strategic guidance for the NSW Government agencies and landholders involved in managing...

  • Flood Project
    Floodplain Risk Management Plan

    Tuppal & Bulltale Creeks - Floodplain Management Plan

    Completed
    Publication date: 01/05/2004
    The Tuppal and Bullatale Creeks FMP has been prepared to replace the 1978 Guidelines. The FMP will serve as the future basis for the management of the Tuppal and Bullatale...

  • Flood Project
    Floodplain Risk Management Study

    Edward and Wakool Rivers Floodplain Management Strategy - Noorong Road to Wak...

    Completed
    Publication date: 01/07/2000
    The floodplain area covered by this strategy lies within the Central Murray region of the Murray River Valley. This region extends west from Tocumwal to the junction of the...

  • Flood Project
    Visual Levee Audits

    Audit of Flood Levees for New South Wales - Town of Tocumwal

    Completed
    Publication date: 01/12/1992
    The town of Tocumwal, located on the Murray River in New South Wales has a population of approximately 1,500. Tocumwal is protected from flooding by a levee system consisting of...

  • Flood Project
    Guidance, Tools and Resources

    The Hydrogeology of the Barmah Forest

    Completed
    Publication date: 01/11/1988
    The Barmah Forest is a large area of red gum forest located on the flood plain of the River Murray between Tocumwal and Echuca. Concern has been expressed by the River Murray...

  • Flood Project
    Floodplain Risk Management Study

    Murray River Flood Plain Management Study

    Completed
    Publication date: 01/12/1986
    "The principal objectives of the Murray River flood plain management study were to identify flooding problems within the 12700 km2 study area from Lake Hume to the South...

  • Flood Project
    Guidance, Tools and Resources

    Murray River - Flood Plain Atlas

    Completed
    Publication date: 01/01/1986
    The Rural Water Commission of Victoria and the Water Resources Commission of New South Wales in 1984 commissioned Gutteridge Haskins and Davey Pty. Ltd., Cameron McNamara Pty....

  • Flood Project
    Guidance, Tools and Resources

    River Murray - Tocumwal to Echuca - Restoration of Natural Levees and Regulat...

    Completed
    Publication date: 01/11/1984
    "This report provides information on the restoration of natural levees and regulators for the Millewa/Barmah red gum forests. The report reviews investigations and corresponding...