-
Flood ProjectFloodplain Risk Management Study and Plan
Lower Macleay River Floodplain Risk Management Study and Plan
CompletedPublication date: 29/08/2024The Lower Macleay River floodplain occupies approximately 500km2 of coastal floodplain downstream of Kempsey, to the Macleay River’s main outlet at South West Rocks. The...
-
Flood ProjectFlood study
Lower Macleay Flood Study
CompletedPublication date: 22/11/2019The Lower Macleay River floodplain occupies an approximately 500km2 of coastal floodplain downstream of Kempsey, to the Macleay River’s main outlet at South West Rocks. The...
-
Flood ProjectFlood study
Kempsey Hydraulic Model Tuflow Update
CompletedPublication date: 01/12/2016At the commencement of the Kempsey CBD Floodplain Risk Management Study and Plan it was decided to convert Council’s existing flood model to a TUFLOW model. It was considered...
-
Flood ProjectFlood study
Kempsey Flood Study Hydraulic Modelling Report
CompletedPublication date: 01/08/2009The central business district (CBD) of Kempsey is sited on a natural overbank flow path of the Macleay River and is prone to severe flooding during floods in the order of the...
-
Flood ProjectGuidance, Tools and Resources
Macleay - Floodplain Survey
CompletedPublication date: 01/02/2007The Kempsey Local Emergency Management Committee had for some time been considering issues relating to flooding of the Lower Macleay Floodplain. Increasing development on the...