Flood ProjectDetailed Design
St Marys Flood Protection Levee Upgrade – Investigation and Detail Design
CompletedPublication date: 31/12/2024This project is to undertake detailed investigations including detailed survey of the levee, a complete auditing of the levee to identify any structural defects including soil...
-
Flood ProjectFloodplain Risk Management Study
Wianamatta South Creek Cumulative Impact Assessment (Rev E)
CompletedPublication date: 24/01/2023In recognition of the significant development pressures in the Wianamatta South Creek catchment, this Cumulative Impact Assessment was commissioned to inform Infrastructure NSW,...
-
Flood ProjectFlood study
Wianamatta South Creek Catchment Flood Study - Existing Conditions (Rev I)
CompletedPublication date: 23/05/2022The Wianamatta South Creek Catchment Flood Study - Existing Conditions (2022) report updates and extends a previous study prepared for Penrith City Council in association with...
-
Flood ProjectFloodplain Risk Management Study and Plan
South Creek Floodplain Risk Management Study and Plan
CompletedPublication date: 27/04/2020Introduction Penrith City Council, through its Floodplain Risk Management Committee and Advisian Pty Ltd, has completed a Floodplain Risk Management Study for those sections of...
-
Flood ProjectFlood study
College, Orth and Werrington Creeks Catchment Overland Flow Flood Study
CompletedPublication date: 05/06/2017The College, Orth and Werrington Creeks Catchment Overland Flow Flood Study was prepared for Penrith City Council to identify main stream and overland flood behaviour across the...
-
Flood ProjectFlood study
Eastern Creek Catchment Hydraulic Assessment
CompletedPublication date: 01/11/2014Eastern Creek is located in Western Sydney and drains a catchment area of 118 km2 to South Creek which, in turn, drains into the Hawkesbury River near Windsor. Eastern Creek...
-
Flood ProjectGuidance, Tools and Resources
South Creek - Bank Management Plan
CompletedPublication date: 04/02/2008This report has been prepared for Warringah Council to assist in the management of South Creek and to identify the type and scale of works that may be required to secure...
-
Flood ProjectGuidance, Tools and Resources
Camden - Flood Risk Management Policy
CompletedPublication date: 10/04/2006The Flood Risk Management Policy establishes flood risk management planning and development procedures for all flood prone land within the Camden Local Government Area (LGA)....