-
Flood ProjectFlood study
Shoalhaven City Council - Terara Levee Audit
CompletedPublication date: 02/10/2001Sinclair Knight Merz was commissioned by Shoalhaven City Council to carry out an audit of Terara Levee. The study was required to cover the following areas: Survey of the top of...
-
Flood ProjectGuidance, Tools and Resources
Lower Shoalhaven - A Report On The Impact Of Construction of a Levee on Pig Island
CompletedPublication date: 01/09/1992A levee is proposed along the southern shoreline of Pig Island to retain and drain saturated sands and silts pumped across to the island from a sand washing plant at Terrara. At...