-
Flood ProjectFloodplain Risk Management Plan
Kangaroo Valley Floodplain Risk Management Plan
CompletedPublication date: 01/04/2016The Kangaroo River is a tributary of the Shoalhaven River, on the south coast of New South Wales. The river originates from within the Budderoo National Park, from where it...
-
Flood ProjectFloodplain Risk Management Study
Kangaroo Valley Floodplain Risk Management Study
CompletedPublication date: 01/04/2016The Kangaroo River is a tributary of the Shoalhaven River, on the south coast of New South Wales. The river originates from within the Budderoo National Park, from where it...
-
Flood ProjectFloodplain Risk Management Study and Plan
Lower Shoalhaven River Floodplain Management Study & Plan - Climate Change Assessment
CompletedPublication date: 01/08/2011The main objective of this study is to amend the existing Lower Shoalhaven River Floodplain Risk Management Study and Plan to incorporate the predicted impacts of climate...
-
Flood ProjectGuidance, Tools and Resources
Lower Shoalhaven River Hazard and Hydraulic Categories
CompletedPublication date: 01/05/2008Hazard and Hydraulic Categories. Extents and categorisations based on Flood Planning Level (1% AEP flood + 500mm freeboard).
-
Flood ProjectGuidance, Tools and Resources
Shoalhaven River Entrance Management Plan for Flood Mitigation
CompletedPublication date: 01/11/2006If the entrance of the Shoalhaven River at Shoalhaven Heads were to remain closed during a flood, water levels would be significantly higher for longer in some parts of the...
-
Flood ProjectVisual Levee Audits
Terara Levee - Final Design Report
CompletedPublication date: 01/03/2005In the mid-1970s, a levee was built along the southern bank of the Shoalhaven River from Nowra Bridge to Terara village. Following floods in the 1970s, the height of the Terara...
-
Flood ProjectGeotech Report on levee
Terara Levee Restoration & Upgrade Project - Additional Geotechnical...
CompletedPublication date: 01/09/2003This report presents the results of an additional geotechnical investigation carried out by Sinclair Knight Merz Pty Ltd along a section of the Shoalhaven River bank known as...
-
Flood ProjectFloodplain Risk Management Plan
Terara Village Floodplain Management Plan
CompletedPublication date: 26/02/2002The Shoalhaven River catchment covers an area of 7000 square kilometres with approximately 120 square kilometres of floodplain downstream of Nowra. The village of Terara is...
-
Flood ProjectFloodplain Risk Management Study
Riverview Road Area - Nowra Floodplain Management Study
CompletedPublication date: 26/02/2002The land on the south bank of the Shoalhaven River downstream of Nowra Bridge has had a history of flooding. This Floodplain Management Study examines flooding issues relating...
-
Flood ProjectFloodplain Risk Management Study
Terara Village Floodplain Management Study
CompletedPublication date: 26/02/2002This Floodplain Management Study examines flooding issues relating to the village of Terara and adjoining properties which are located on the south bank of the Shoalhaven River...
-
Flood ProjectFloodplain Risk Management Plan
Riverview Road Area, Nowra - Floodplain Management Plan
CompletedPublication date: 26/02/2002The Shoalhaven River rises approximately 50km inland of Moruya and follows a northerly direction for 170km before turning east for a further 90km to reach the Pacific Ocean at...
-
Flood ProjectFlood study
Shoalhaven City Council - Terara Levee Audit
CompletedPublication date: 02/10/2001Sinclair Knight Merz was commissioned by Shoalhaven City Council to carry out an audit of Terara Levee. The study was required to cover the following areas: Survey of the top of...
-
Flood ProjectGuidance, Tools and Resources
Lower Shoalhaven - A Report On The Impact Of Construction of a Levee on Pig Island
CompletedPublication date: 01/09/1992A levee is proposed along the southern shoreline of Pig Island to retain and drain saturated sands and silts pumped across to the island from a sand washing plant at Terrara. At...
-
Flood ProjectPost event data collection
Flooding of Shoalhaven River - 1st-3rd August 1990
CompletedPublication date: 01/12/1990On 31st July 1990, a low pressure system developed off the Queensland Coast. This system moved slowly south over the next few days directing easterly winds into most of the NSW...
-
Flood ProjectFlood study
Shoalhaven Milling Company Nowra - Flood Study For Proposed Flour Mill
CompletedPublication date: 01/10/1990The Shoalhaven Milling Company is proposing the development of a Flour Mill on Bolong Road, Nowra, at a site located approximately 300m north-east of their existing milling...
-
Flood ProjectFlood study
Shoalhaven Milling Company - Flood Study For Proposed Mill Extensions
CompletedPublication date: 01/12/1989This flood study has been undertaken for the Shoalhaven Milling Company of Nowra, to investigate flooding at the site of proposed extension to their existing mill. The mill is...
-
Flood ProjectPost event flood behaviour reports
Flooding of the Shoalhaven River 29th April-1st May 1988
CompletedPublication date: 01/05/1988Heavy rainfall in the upper catchment of the Shoalhaven River during the period 29 April to 1 May 1988 resulted in a major flood occurring in the lower reaches of the river....
-
Flood ProjectGuidance, Tools and Resources
Shoalhaven River - Investigation
CompletedPublication date: 01/01/1111The following report has been prepared in an effort to compile as much information as possible regarding the investigations which have been carried out into the resources of the...
-
Flood ProjectGuidance, Tools and Resources
Nowra & Browns Creeks Hazard and Hydraulic Categories 1% AEP
CompletedPublication date: 01/01/1111Hazard and Hydraulic Categories. Extents and categorisations based on the 100-year flood.
-
Flood ProjectGuidance, Tools and Resources
Shoalhaven River - Flood History
CompletedPublication date: 01/01/1111This document contains a compilation of extracts from documents relating to flooding in the Shoalhaven River between 1817 and 1980. It includes extracts from: News reports...