20 Flood Projects found

Tags: Shoalhaven River River Basin: 215 - Shoalhaven

Filter Results
  • Flood Project
    Floodplain Risk Management Plan

    Kangaroo Valley Floodplain Risk Management Plan

    Completed
    Publication date: 01/04/2016
    The Kangaroo River is a tributary of the Shoalhaven River, on the south coast of New South Wales. The river originates from within the Budderoo National Park, from where it...

  • Flood Project
    Floodplain Risk Management Study

    Kangaroo Valley Floodplain Risk Management Study

    Completed
    Publication date: 01/04/2016
    The Kangaroo River is a tributary of the Shoalhaven River, on the south coast of New South Wales. The river originates from within the Budderoo National Park, from where it...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Lower Shoalhaven River Floodplain Management Study & Plan - Climate Change Assessment

    Completed
    Publication date: 01/08/2011
    The main objective of this study is to amend the existing Lower Shoalhaven River Floodplain Risk Management Study and Plan to incorporate the predicted impacts of climate...

  • Flood Project
    Guidance, Tools and Resources

    Lower Shoalhaven River Hazard and Hydraulic Categories

    Completed
    Publication date: 01/05/2008
    Hazard and Hydraulic Categories. Extents and categorisations based on Flood Planning Level (1% AEP flood + 500mm freeboard).

  • Flood Project
    Guidance, Tools and Resources

    Shoalhaven River Entrance Management Plan for Flood Mitigation

    Completed
    Publication date: 01/11/2006
    If the entrance of the Shoalhaven River at Shoalhaven Heads were to remain closed during a flood, water levels would be significantly higher for longer in some parts of the...

  • Flood Project
    Visual Levee Audits

    Terara Levee - Final Design Report

    Completed
    Publication date: 01/03/2005
    In the mid-1970s, a levee was built along the southern bank of the Shoalhaven River from Nowra Bridge to Terara village. Following floods in the 1970s, the height of the Terara...

  • Flood Project
    Geotech Report on levee

    Terara Levee Restoration & Upgrade Project - Additional Geotechnical...

    Completed
    Publication date: 01/09/2003
    This report presents the results of an additional geotechnical investigation carried out by Sinclair Knight Merz Pty Ltd along a section of the Shoalhaven River bank known as...

  • Flood Project
    Floodplain Risk Management Plan

    Terara Village Floodplain Management Plan

    Completed
    Publication date: 26/02/2002
    The Shoalhaven River catchment covers an area of 7000 square kilometres with approximately 120 square kilometres of floodplain downstream of Nowra. The village of Terara is...

  • Flood Project
    Floodplain Risk Management Study

    Riverview Road Area - Nowra Floodplain Management Study

    Completed
    Publication date: 26/02/2002
    The land on the south bank of the Shoalhaven River downstream of Nowra Bridge has had a history of flooding. This Floodplain Management Study examines flooding issues relating...

  • Flood Project
    Floodplain Risk Management Study

    Terara Village Floodplain Management Study

    Completed
    Publication date: 26/02/2002
    This Floodplain Management Study examines flooding issues relating to the village of Terara and adjoining properties which are located on the south bank of the Shoalhaven River...

  • Flood Project
    Floodplain Risk Management Plan

    Riverview Road Area, Nowra - Floodplain Management Plan

    Completed
    Publication date: 26/02/2002
    The Shoalhaven River rises approximately 50km inland of Moruya and follows a northerly direction for 170km before turning east for a further 90km to reach the Pacific Ocean at...

  • Flood Project
    Flood study

    Shoalhaven City Council - Terara Levee Audit

    Completed
    Publication date: 02/10/2001
    Sinclair Knight Merz was commissioned by Shoalhaven City Council to carry out an audit of Terara Levee. The study was required to cover the following areas: Survey of the top of...

  • Flood Project
    Guidance, Tools and Resources

    Lower Shoalhaven - A Report On The Impact Of Construction of a Levee on Pig Island

    Completed
    Publication date: 01/09/1992
    A levee is proposed along the southern shoreline of Pig Island to retain and drain saturated sands and silts pumped across to the island from a sand washing plant at Terrara. At...

  • Flood Project
    Post event data collection

    Flooding of Shoalhaven River - 1st-3rd August 1990

    Completed
    Publication date: 01/12/1990
    On 31st July 1990, a low pressure system developed off the Queensland Coast. This system moved slowly south over the next few days directing easterly winds into most of the NSW...

  • Flood Project
    Flood study

    Shoalhaven Milling Company Nowra - Flood Study For Proposed Flour Mill

    Completed
    Publication date: 01/10/1990
    The Shoalhaven Milling Company is proposing the development of a Flour Mill on Bolong Road, Nowra, at a site located approximately 300m north-east of their existing milling...

  • Flood Project
    Flood study

    Shoalhaven Milling Company - Flood Study For Proposed Mill Extensions

    Completed
    Publication date: 01/12/1989
    This flood study has been undertaken for the Shoalhaven Milling Company of Nowra, to investigate flooding at the site of proposed extension to their existing mill. The mill is...

  • Flood Project
    Post event flood behaviour reports

    Flooding of the Shoalhaven River 29th April-1st May 1988

    Completed
    Publication date: 01/05/1988
    Heavy rainfall in the upper catchment of the Shoalhaven River during the period 29 April to 1 May 1988 resulted in a major flood occurring in the lower reaches of the river....

  • Flood Project
    Guidance, Tools and Resources

    Shoalhaven River - Investigation

    Completed
    Publication date: 01/01/1111
    The following report has been prepared in an effort to compile as much information as possible regarding the investigations which have been carried out into the resources of the...

  • Flood Project
    Guidance, Tools and Resources

    Nowra & Browns Creeks Hazard and Hydraulic Categories 1% AEP

    Completed
    Publication date: 01/01/1111
    Hazard and Hydraulic Categories. Extents and categorisations based on the 100-year flood.

  • Flood Project
    Guidance, Tools and Resources

    Shoalhaven River - Flood History

    Completed
    Publication date: 01/01/1111
    This document contains a compilation of extracts from documents relating to flooding in the Shoalhaven River between 1817 and 1980. It includes extracts from: News reports...