24 Flood Projects found

Tags: Princes Highway

Filter Results
  • Flood Project
    Flood study

    Duck Creek Flood Study

    Completed
    Publication date: 31/05/2019
    The Duck Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Duck Creek catchment and establish the basis for...

  • Flood Project
    Floodplain Risk Management Plan

    Bega and Brogo Rivers Floodplain Risk Management Plan

    Completed
    Publication date: 26/03/2018
    The study area is located within the Bega Valley Shire local government area (LGA) on the South Coast of NSW, approximately 80 km from the Victorian border. The total catchment...

  • Flood Project
    Floodplain Risk Management Study

    Bega and Brogo Rivers Floodplain Risk Management Study

    Completed
    Publication date: 26/03/2018
    The study area is located within the Bega Valley Shire local government area (LGA) on the South Coast of NSW, approximately 80 km from the Victorian border. The total catchment...

  • Flood Project
    Flood study

    Alexandra Canal Flood Study

    Completed
    Publication date: 26/05/2017
    The purpose of this Flood Study is to identify local overland flow as well as mainstream flow and define existing flood liability. This objective is achieved through the...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Surf Beach Catchment Kiama - Floodplain Risk Management Study and Plan

    Completed
    Publication date: 22/05/2017
    The Kiama Surf Beach Catchment is located approximately 120 km south of Sydney in the Kiama LGA and drains across Surf Beach to the Tasman Sea via a system of open channels and...

  • Flood Project
    Flood study

    Merimbula Lake and Back Lake Flood Study

    Completed
    Publication date: 16/03/2017
    The study is focused on Merimbula Lake and Back Lake within the Bega Valley Shire LGA. The lakes are located adjacent to one another, with the township of Merimbula situated...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Cooks River Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/02/2015
    The Cooks River drains a catchment of approximately 100 square kilometres in the south-western suburbs of Sydney. The river originates as a small watercourse near the Chullora...

  • Flood Project
    Flood study

    Spring Creek Catchment Flood Study

    Completed
    Publication date: 12/05/2014
    The Spring Creek catchment is situated within Kiama Local Government Area (LGA), a coastal community that is located approximately 120 km south of Sydney, NSW. The nearest urban...

  • Flood Project
    Flood study

    Surf Beach Catchment (South) Flood Study

    Completed
    Publication date: 29/09/2013
    The Surf Beach (south) catchment consists of an area of approximately 110 hectares, comprising approximately 52% (57 hectares) of rural land use and 48% (53 hectares) urban land...

  • Flood Project
    Flood study

    Horsley Creek Flood Study

    Completed
    Publication date: 27/09/2011
    Horsley Creek is located in the Shellharbour City Council local government area, on the New South Wales coastal plain approximately 100 km to the south of the city of Sydney. It...

  • Flood Project
    Floodplain Risk Management Plan

    Eastern Channel East Subcatchment Management Plan

    Completed
    Publication date: 01/01/2011
    Outlines the Eastern Channel (EC) East Community Water Vision 2050, as well as goals and an action plan. Stormwater management options are also detailed and illustrated, such as...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Allans Creek Flood Study, Allans Creek Floodplain Risk Management Study,...

    Completed
    Publication date: 05/09/2008
    A flood study of the Allans Creek catchment was undertaken to define the nature and extent of flooding in the study area for a range of design rainfall events. As part of the...

  • Flood Project
    Floodplain Risk Management Study

    Allans Creek Floodplain Risk Management Study (Revised)

    Completed
    Publication date: 01/09/2006
    The Allans Creek catchment has an area of 42 square kilometres. The catchment lies to the south west of the Wollongong CBD and rises up to the Illawarra escarpment. The...

  • Flood Project
    Flood study

    Broughton Creek Flood Study

    Completed
    Publication date: 01/06/2006
    Broughton Creek is a tributary of the Shoalhaven River draining the hills of Cambewarra Range and the Shoalhaven floodplain on the northern side of the river. The catchment area...

  • Flood Project
    Flood study

    Nowra and Browns Creeks Flood Study

    Completed
    Publication date: 11/03/2005
    Nowra Creek is a tributary of the Shoalhaven River that drains the area to the south-west of the central business district and major residential areas of Nowra. It is an...

  • Flood Project
    Environmental Impact Statements

    Fowlers Road West Dapto - Environmental Impact Assessment

    Completed
    Publication date: 01/06/1999
    West Dapto has been targeted for large-scale urban expansion in the City of Wollongong, and has the potential to accommodate approximately 60,000 people over a 25 to 30 year...

  • Flood Project
    Flood study

    Flood Study Racecourse Creek, Moruya

    Completed
    Publication date: 01/02/1999
    This report contains the results of an investigation of flooding of the Princes Highway and South Head Road at Moruya, and the options available to reduce flooding. The study...

  • Flood Project
    Post event flood behaviour reports

    A Report on the Impact of Flooding on the Development of Land at Macquarie...

    Completed
    Publication date: 01/01/1990
    Soredo Pty Ltd has proposed that Part Lots 5 and 6 DP717741 Princes Highway, Yallah be developed for tourist purposes inclusive of tourist related light industries. This report...

  • Flood Project
    Flood study

    Flood Study of Portion -232 Princes Highway, Ulladulla

    Completed
    Publication date: 01/05/1982
    The purpose of this study is to determine the estimated flood level that would occur for both a 1 in 100 year and 1 in 20 year storm on the abovementioned land (Portion 232,...

  • Flood Project
    Guidance, Tools and Resources

    Cow, Tullarwalla and Wandantian Creeks - Flood Map

    Completed
    Publication date: 11/11/1111
    Hazard and hydraulic categories; extents and categorisations based on the Flood Planning Level (1% AEP flood + 500mm freeboard).