10 Flood Projects found

Tags: Port Stephens

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Final Port Stephens Foreshore (Floodplain) Risk Management Study and Plan Review

    Completed
    Publication date: 31/07/2021
    Study Objectives The key outcome of this study is to revise Council's floodplain mapping and recommend how the outcomes can be incorporated into planning controls for future...

  • Flood Project
    Flood study

    Lower Myall River and Myall Lakes Flood Study

    Completed
    Publication date: 04/06/2015
    The Lower Myall River catchment encompasses an area of approximately 900 square kilometres and is located north of Port Stephens in the Great Lakes Council Local Government...

  • Flood Project
    Guidance, Tools and Resources

    The Maitland Mercury- Superstorm Survey

    Completed
    Publication date: 02/06/2015
    Newspaper Article from The Maitland Mercury: City receives 240 responses on superstorm survey.

  • Flood Project
    Flood study

    Port Stephens Design Flood Levels Climate Change Review

    Completed
    Publication date: 01/11/2010
    Port Stephens is a large tidal estuary with a waterway area of approximately 140 square kilometres and a total catchment area of 2900 square kilometres. It is located 150...

  • Flood Project
    Floodplain Risk Management Study

    Lower Hunter Valley Floodplain Risk Management Study - Volume B Planning...

    Completed
    Publication date: 07/11/2001
    The Volume B SUMMARY REPORT outlines the draft flood planning controls that are presented in the detailed Volume B REPORT, which forms the Draft Planning Implementation Strategy...

  • Flood Project
    Flood study

    Port Stephens Flood Study - Design Water Levels and Wave Climate

    Completed
    Publication date: 22/07/1996
    Port Stephens is a large tidal estuary located on the central coast of New South Wales, approximately 50 kilometres north-east of Newcastle. The waterway area of the estuary...

  • Flood Project
    Flood study

    Raymond Terrace - Flood Study

    Completed
    Publication date: 01/07/2011
    The objective of the study was to undertake a detailed flood study of the local overland flow catchments of Raymond Terrace and establish models as necessary for design flood...

  • Flood Project
    Flood study

    Williams River - Flood Study

    Completed
    Publication date: 01/07/2009
    Dungog Shire Council and Port Stephens Councils have commissioned this study in order to define the riverine flood behaviour in the Williams River from Raymond Terrace to 5km...

  • Flood Project
    Floodplain Risk Management Plan

    Port Stephens - Foreshore Floodplain Management Plan

    Completed
    Publication date: 01/04/2002
    This plan is for Port Stephens, a large tidal estuary north of Sydney. This plan was initiated by Port Stephens and Great Lakes Councils to provide the basis for the future...

  • Flood Project
    Floodplain Risk Management Study

    Port Stephens - Foreshore Floodplain Management Study

    Completed
    Publication date: 01/04/2002
    This study was initiated by Port Stephens and Great Lakes Councils to help manage the flood problem. The primary objectives of the Study were to define the nature and extent of...