9 Flood Projects found

Tags: Penrith River Basin: 212 - Hawkesbury

Filter Results
  • Flood Project
    Flood study

    Penrith CBD Detailed Overland Flow Flood Study

    Completed
    Publication date: 07/07/2015
    Penrith City Council completed a broad-scale overland flow flood study (”Overview Study”) in October 2006 (Cardno Lawson Treloar, 2006) in order to prioritise future detailed...

  • Flood Project
    Guidance, Tools and Resources

    Assessment of the Variability of Rates of Rise for Hydrographs on the...

    Completed
    Publication date: 17/03/2008
    Webb, McKeown & Associates were engaged by the SES to undertake an analysis of possible rates f rise and their probabilities at Penrith and Windsor, particularly for design...

  • Flood Project
    Floodplain Risk Management Plan

    Hawkesbury-Nepean Floodplain Management Strategy Implementation

    Completed
    Publication date: 01/10/2004
    Table of contents: The Hawkesbury-Nepean flood problem Providing effective evacuation routes Better flood forecasting and warning Improved flood emergency response Communicating...

  • Flood Project
    Guidance, Tools and Resources

    Road Evacuation Route Upgrade Strategy Local Hydraulics Specification Study...

    Completed
    Publication date: 06/03/2002
    This Study investigated the hydraulic capacity of ten (10) low points identified in the road network used for emergency flood evacuation in the Emu Plains area. The Emu Plains...

  • Flood Project
    Guidance, Tools and Resources

    Hawkesbury-Nepean Floodplain Management Strategy - Analysis of Community...

    Completed
    Publication date: 01/08/2001
    The Analysis of Community Attitudes to Flood Related Risks study was designed to provide the Hawkesbury-Nepean Floodplain Management Steering Committee with key information...

  • Flood Project
    Guidance, Tools and Resources

    Hawkesbury Nepean Floodplain Management Strategy - Road Evacuation Route...

    Completed
    Publication date: 01/07/2000
    Egan National Valuers have been retained by the NSW Department of Land & Water Conservation to carry out a valuation study of the impact that existing and proposed planning...

  • Flood Project
    Guidance, Tools and Resources

    Hawkesbury Nepean River - Impacts of Flooding on Communities & Infrastructure

    Completed
    Publication date: 24/09/1997
    This report investigates the consequences of flooding for assets and communities in the Hawkesbury-Nepean Valley between Regentville and Spencer. There is particular emphasis on...

  • Flood Project
    Flood study

    Warragamba - Flood Study - Stage 1

    Completed
    Publication date: 01/04/1988
    This report describes the hydraulic modelling for the first stage of a flood study of the Hawkesbury-Nepean Valley commissioned by the Water Board in 1987. The study is required...

  • Flood Project
    Guidance, Tools and Resources

    Hawkesbury River - Hydraulic & Sediment Transport Processes

    Completed
    Publication date: 01/12/1987
    The Hawkesbury River Valley covers an area of approximately 22,000 square kilometres and supports a population of some 500,000. It is of major significance for water supply,...