-
Flood ProjectFlood study
Penrith CBD Detailed Overland Flow Flood Study
CompletedPublication date: 07/07/2015Penrith City Council completed a broad-scale overland flow flood study (”Overview Study”) in October 2006 (Cardno Lawson Treloar, 2006) in order to prioritise future detailed...
-
Flood ProjectFloodplain Risk Management Plan
Hawkesbury-Nepean Floodplain Management Strategy Implementation
CompletedPublication date: 01/10/2004Table of contents: The Hawkesbury-Nepean flood problem Providing effective evacuation routes Better flood forecasting and warning Improved flood emergency response...
-
Flood ProjectGuidance, Tools and Resources
Road Evacuation Route Upgrade Strategy Local Hydraulics Specification Study E...
CompletedPublication date: 06/03/2002This Study investigated the hydraulic capacity of ten (10) low points identified in the road network used for emergency flood evacuation in the Emu Plains area. The Emu Plains...
-
Flood ProjectFlood study
Nepean River at Penrith Flood Study
CompletedPublication date: 01/04/1997The Nepean River Flood Study at Penrith was commenced in March 1995 to consolidate previous studies covering this area and establish flooding behaviour under existing floodplain...
-
Flood ProjectFlood study
Peach Tree Creek - Flood Study
CompletedPublication date: 01/09/1994The purpose of the study was to define flood behaviour in the Peach Tree Creek floodplain, which is located on the right bank of the Nepean. River between the M4 Motorway and...
-
Flood ProjectPost event flood behaviour reports
Camden, Penrith - Report on the 1867 Flood
CompletedPublication date: 01/01/1985This report presents an estimate 16,600 cubic metres per second for the peak flow rate in the Warragamba Gorge during the flood on or around the 22nd of June 1867. The method...