7 Flood Projects found

Tags: New England Highway

Filter Results
  • Flood Project
    Floodplain Risk Management Plan

    Bendemeer Floodplain Risk Management Plan

    Completed
    Publication date: 09/08/2016
    Bendemeer is located beside the Macdonald River approximately 42km north-east of Tamworth, along the New England Highway. The catchment has an area of about 1140 square...

  • Flood Project
    Floodplain Risk Management Study

    Bendemeer Floodplain Risk Management Study

    Completed
    Publication date: 08/08/2016
    Bendemeer is located beside the Macdonald River approximately 42km north-east of Tamworth, along the New England Highway. The catchment has an area of about 1140 square...

  • Flood Project
    Flood study

    Bendemeer Flood Study

    Completed
    Publication date: 25/04/2012
    The subject area is located along the MacDonald River within the town of Bendemeer, situated approximately 40km north-east of Tamworth. The catchment leading to the town of...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Quirindi Township and Surrounding Area Floodplain Risk Management Study and Plan

    Completed
    Publication date: 10/10/2011
    Quirindi Creek confluences with Jacob and Joseph Creek, downstream of Gurton Street and upstream of Whitaker Street, in the township of Quirindi. During large flood events, the...

  • Flood Project
    Floodplain Risk Management Plan

    Lochinvar Floodplain Risk Management Plan

    Completed
    Publication date: 30/09/1998
    The Floodplain Management Plan represents Stage 3 of the floodplain management process and provides an overall plan for better management of the floodplain. The key components...

  • Flood Project
    Floodplain Risk Management Study

    Lochinvar Floodplain Management Study

    Completed
    Publication date: 01/05/1997
    Lochinvar Creek has a catchment area of 15.2 square kilometres and is a minor tributary of the Hunter River. The township of Lochinvar is located on Lochinvar Creek within the...

  • Flood Project
    Flood study

    Shire Roads Flooding Study

    Completed
    Publication date: 11/11/1111
    The Hunter River forms a natural barrier to transport and communication in times of major flood. Consequently, on a geographical basis residents to the west of the Hunter River...