-
Flood ProjectFlood study
Peach Tree and Lower Surveyors Creek Flood Study
CompletedPublication date: 01/04/2019The Peach Tree and Lower Surveyors Creeks Flood Study covers an area of 1,250 hectares within the Penrith City Council Local Government Area (LGA). As shown in Figure 1, the...
-
Flood ProjectFlood study
Nepean River Flood Study
CompletedPublication date: 12/11/2018The Hawkesbury-Nepean River catchment is one of the largest coastal basins in NSW with an area of 21,400 square kilometres. The catchment at Penrith is 52% of the total area and...
-
Flood ProjectFloodplain Risk Management Plan
Hawkesbury-Nepean Floodplain Management Strategy Implementation
CompletedPublication date: 01/10/2004Table of contents: The Hawkesbury-Nepean flood problem Providing effective evacuation routes Better flood forecasting and warning Improved flood emergency response...
-
Flood ProjectGuidance, Tools and Resources
Road Evacuation Route Upgrade Strategy Local Hydraulics Specification Study E...
CompletedPublication date: 06/03/2002This Study investigated the hydraulic capacity of ten (10) low points identified in the road network used for emergency flood evacuation in the Emu Plains area. The Emu Plains...
-
Flood ProjectFlood study
Nepean River at Penrith Flood Study
CompletedPublication date: 01/04/1997The Nepean River Flood Study at Penrith was commenced in March 1995 to consolidate previous studies covering this area and establish flooding behaviour under existing floodplain...
-
Flood ProjectFlood study
Peach Tree Creek - Flood Study
CompletedPublication date: 01/09/1994The purpose of the study was to define flood behaviour in the Peach Tree Creek floodplain, which is located on the right bank of the Nepean. River between the M4 Motorway and...