Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

10 Flood Projects found

Tags: Narrabri

Filter Results
  • Flood Project
    Flood study

    Narrabri Flood Study Review

    Completed
    Publication date: 01/02/2014
    URS Australia Pty Ltd (URS) was commissioned by Narrabri Shire Council (Council) to upgrade the previously constructed MIKE11 hydraulic model of the Narrabri Creek/Namoi River...

  • Flood Project
    Floodplain Risk Management Plan

    Lower Coxs Creek Floodplain Management Plan

    Completed
    Publication date: 01/07/2013
    The Lower Coxs Creek floodplain stretches approximately 53 km along the Coxs Creek, from Mullaley to upstream of Boggabri. The nature of flooding across the floodplain has...

  • Flood Project
    Guidance, Tools and Resources

    Namoi Catchment - Water Resources and Management Overview

    Completed
    Publication date: 01/02/2011
    The Namoi River is one of the Murray-Darling Basin's major NSW sub-catch merits. It covers an area of about 42,000 km from the Great Dividing Range near Tamworth to the Barwon...

  • Flood Project
    Flood study

    Narrabri Bypass Flood Study Progress Report

    Completed
    Publication date: 10/09/2008
    The first stage of a feasibility study into constructing a flood bypass around the eastern side of Narrabri has been completed. A detailed ground survey of the route from the...

  • Flood Project
    Flood study

    Narrabri - Proposal for Bypass Feasibility Flood Study

    Completed
    Publication date: 22/02/2007
    Major floods in Narrabri occur on average once every ten years, causing significant damage to the public and private property of the town’s 7,500 residents. In addition,...

  • Flood Project
    Floodplain Risk Management Study

    Moomin Creek Floodplain Management Study

    Completed
    Publication date: 01/05/2006
    This floodplain management study is concerned with the floodplain of Moomin Creek. The FMP area stretches approximately 80 km along Moomin Creek from upstream of the Gurley...

  • Flood Project
    Flood study

    Moomin Creek Flood Study

    Completed
    Publication date: 01/09/2003
    This floodplain management study is concerned with the floodplain of Moomin Creek. The study area is located within a designated floodplain and stretches approximately 80 km...

  • Flood Project
    Floodplain Risk Management Study

    Narrabri Floodplain Management Study

    Completed
    Publication date: 01/02/1999
    The town of Narrabri is located within the floodplain of the Namoi River in the north-west of North South Wales. About ten major floods have inundated the town this century. The...

  • Flood Project
    Flood study

    Preliminary Flood Study for Alternative Power Station Locations in the Lower ...

    Completed
    Publication date: 01/08/1991
    The Electricity Commission of New South Wales (ECNSW) engaged Water Resources Consulting Services to undertake a flood study of the lower Namoi Valley between Gunnedah and...

  • Flood Project
    Guidance, Tools and Resources

    Narrabri to Wee Waa - Proposed Modifications to Floodway Restoration Scheme

    Completed
    Publication date: 01/03/1984
    A major flood occurred in the Namoi River during late January and early February 1984 which caused significant damage to the maturing cotton crop. Most of this damage resulted...