39 Flood Projects found

Tags: Namoi River

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Boggabri Floodplain Risk Management Study and Plan 2024

    Completed
    Publication date: 27/02/2024
    WRM was commissioned by Narrabri Shire Council to prepare the Boggabri Floodplain Risk Management Study and Plan (FRMP). The FRMSP was adopted by NSC in 2024.

  • Flood Project
    Flood study

    Narrabri Floodplain Risk Management Study and Plan 2023

    Completed
    Publication date: 30/05/2023
    WRM was commissioned by Narrabri Shire Council to prepare the Narrabri Floodplain Risk Management Study and Plan (FRMP) . The study included a supplementary Flood Study to...

  • Flood Project
    Flood study

    Boggabri Flood Study - 2021

    Completed
    Publication date: 29/01/2021
    The township of Boggabri is located in the northwest of New South Wales within the Narrabri Shire Council LGA. The township sits at the confluence of the Namoi River and Coxs...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Manilla Floodplain Risk Management Study and Draft Plan

    Completed
    Publication date: 13/02/2018
    The upper catchments of the Manilla and Namoi River catchments are located to the northwest of Tamworth in the New England region of NSW. Both rivers drain large catchments...

  • Flood Project
    Floodplain Risk Management Plan

    Bendemeer Floodplain Risk Management Plan

    Completed
    Publication date: 09/08/2016
    Bendemeer is located beside the Macdonald River approximately 42km north-east of Tamworth, along the New England Highway. The catchment has an area of about 1140 square...

  • Flood Project
    Floodplain Risk Management Study

    Bendemeer Floodplain Risk Management Study

    Completed
    Publication date: 08/08/2016
    Bendemeer is located beside the Macdonald River approximately 42km north-east of Tamworth, along the New England Highway. The catchment has an area of about 1140 square...

  • Flood Project
    Flood study

    Narrabri Flood Study Review

    Completed
    Publication date: 01/02/2014
    URS Australia Pty Ltd (URS) was commissioned by Narrabri Shire Council (Council) to upgrade the previously constructed MIKE11 hydraulic model of the Narrabri Creek/Namoi River...

  • Flood Project
    Visual Levee Audits

    Wee Waa Levee Visual Audit

    Completed
    Publication date: 06/11/2013
    Wee Waa is located approximately 30 km West of Narrabri and approximately 430 km Northwest of Sydney. The township is situated on the floodplain of the Namoi River. The Wee Waa...

  • Flood Project
    Flood study

    Barraba Flood Study

    Completed
    Publication date: 01/04/2012
    The upper catchments of the Manilla River are located to the northwest of Tamworth in the New England region of the NSW. The river drains a large (771 square kilometres)...

  • Flood Project
    Guidance, Tools and Resources

    Namoi Catchment - Water Resources and Management Overview

    Completed
    Publication date: 01/02/2011
    The Namoi River is one of the Murray-Darling Basin's major NSW sub-catch merits. It covers an area of about 42,000 km from the Great Dividing Range near Tamworth to the Barwon...

  • Flood Project
    Post event flood behaviour reports

    Flood Intelligence Collection and Review for the Macdonald, Peel and Namoi Rivers

    Completed
    Publication date: 01/04/2009
    Serious flooding was experienced in the Macdonald, Peel and Namoi River Valleys from 28th to 30th November 2008. The State Emergency Service (SES) is the combat agency for...

  • Flood Project
    Flood study

    Narrabri Bypass Flood Study Progress Report

    Completed
    Publication date: 10/09/2008
    The first stage of a feasibility study into constructing a flood bypass around the eastern side of Narrabri has been completed. A detailed ground survey of the route from the...

  • Flood Project
    Floodplain Risk Management Study

    Carroll - Boggabri Floodplain Management Study (Draft)

    Completed
    Publication date: 10/08/2006
    The Carroll to Boggabri study area lies within the Namoi River Basin in northern New South Wales. It commences at the village of Carroll, just downstream of the confluence of...

  • Flood Project
    Flood study

    Walgett Levee Flood Study

    Completed
    Publication date: 01/11/2005
    The town of Walgett is located on the Namoi River near its confluence with the Barwon River and is currently protected from flooding by an 8.7km long levee system, which...

  • Flood Project
    Geotech Report on levee

    Walgett - Levee Rehabilitation Review of Works Draft

    Completed
    Publication date: 01/06/2005
    "Following a meeting of 18 February 2005 between Messrs Alan Nelson, Walgett Shire Council (WSC) and Chris Evans and Greg Wilkinson (NSW Department of Commerce) the NSW...

  • Flood Project
    Floodplain Risk Management Plan

    Flood Management Options for Walgett (Draft)

    Completed
    Publication date: 01/10/2003
    The town of Walgett which is located on the Namoi River near its confluence with the Barwon River is protected from flooding by an 8.7km long levee system which surrounds the...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Carroll to Boggabri - Rural Floodplain Management Study and Plan - Proposal...

    Completed
    Publication date: 01/05/2003
    The Department of Sustainable Natural Resources is presently seeking Proposals for the preparation of a Rural Floodplain Management Study and Plan for the Namoi River floodplain...

  • Flood Project
    Flood study

    Carroll to Boggabri Flood Study and Compendium of Data

    Completed
    Publication date: 01/03/2003
    The Study area is located within the Namoi River Basin in northern NSW. It commences at the village of Carroll, downstream of the confluence of the Peel and Namoi Rivers, and...

  • Flood Project
    Floodplain Risk Management Plan

    Draft Narrabri Supplementary Floodplain Management Plan

    Completed
    Publication date: 29/03/2000
    This floodplain management plan has been prepared to provide guidance for the future development of the floodplain within four identified areas. The plan draws on the findings...

  • Flood Project
    Floodplain Risk Management Study

    Gunnedah and Carroll Floodplain Management Study

    Completed
    Publication date: 01/12/1999
    Gunnedah Local Government Area (LGA) is situated in the Northern Statistical Division of NSW and has an area of 5,100 square kilometres. Gunnedah, its largest town, is located...