10 Flood Projects found

Tags: Namoi

Filter Results
  • Flood Project
    Flood study

    Narrabri Flood Study Review

    Completed
    Publication date: 01/02/2014
    URS Australia Pty Ltd (URS) was commissioned by Narrabri Shire Council (Council) to upgrade the previously constructed MIKE11 hydraulic model of the Narrabri Creek/Namoi River...

  • Flood Project
    Flood study

    Manilla Flood Study

    Completed
    Publication date: 25/04/2012
    The upper catchments of the Manilla and Namoi River catchments are located to the northwest of Tamworth in the New England region of NSW. Both rivers drain large catchments...

  • Flood Project
    Guidance, Tools and Resources

    Namoi Catchment - Water Resources and Management Overview

    Completed
    Publication date: 01/02/2011
    The Namoi River is one of the Murray-Darling Basin's major NSW sub-catch merits. It covers an area of about 42,000 km from the Great Dividing Range near Tamworth to the Barwon...

  • Flood Project
    Guidance, Tools and Resources

    Namoi Wetlands - Assessment and Prioritisation Project

    Completed
    Publication date: 01/09/2008
    The Namoi catchment is located in the north-west slopes and plains of New South Wales and lies within the northern region of the Murray-Darling Basin. The catchment has an area...

  • Flood Project
    Guidance, Tools and Resources

    Barwon-Darling River Floodplain Management - Walgett to Bourke - Final...

    Completed
    Publication date: 01/01/2001
    This scoping study has been undertaken with the following aims: to collate available data on flood behaviour, existing development, and significant flood dependent ecosystems on...

  • Flood Project
    Guidance, Tools and Resources

    Barwon-Darling River - Walgett to Bourke - Floodplain Management - Working...

    Completed
    Publication date: 01/12/1999
    A review of current rural floodplain management practice in New South Wales by the Department of Land and Water Conservation (DLWC) has indicated the need for a change in...

  • Flood Project
    Guidance, Tools and Resources

    The Impact of River Regulation on the Natural Flows of the Murray-Darling Basin

    Completed
    Publication date: 01/10/1992
    Development of the rivers of the Murray-Darling Basin for irrigation commenced in the 1880's. Since that time, the quantity of water diverted from the Murray-Darling river...

  • Flood Project
    Guidance, Tools and Resources

    Gwydir Valley Wetlands - Progress Report

    Completed
    Publication date: 01/07/1991
    As part of its charter the Department of Water Resources is committed to the preservation and enhancement of the scientific, cultural and aesthetic values of the state's aquatic...

  • Flood Project
    Guidance, Tools and Resources

    Goulburn River at Ulan - Rainfall & Flood Frequency Analysis

    Completed
    Publication date: 01/12/1989
    The objective of this project is to primarily provide input into the AWRAC sponsored loss rate project, rather than to come to firm conclusive details on initial losses. It is...

  • Flood Project
    Guidance, Tools and Resources

    The Cainozoic Geology, Hydrogeology & Hydrochemistry of the Unconsolidated...

    Completed
    Publication date: 01/01/1985
    "The lower Namoi Valley is an alluviated valley which occupies an area of 5100 km in northern New South Wales. The valley contains a sequence of non-marine alluvial deposits of...