15 Flood Projects found

Tags: Muswellbrook

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Muswellbrook FRMS&P

    Completed
    Publication date: 08/04/2019
    Study Area Muswellbrook and Denman are located in Upper Hunter Region of NSW approximately 110 km north west of Newcastle. Muswellbrook is situated at the confluence of the...

  • Flood Project
    Flood study

    Hunter River Flood Study (Muswellbrook to Denman) 2017

    Completed
    Publication date: 01/10/2017
    Muswellbrook Shire Council (Council) commissioned Royal HaskoningDHV (RHDHV) to produce the Hunter River (Muswellbrook to Denman) Floodplain Risk Management Study (FRMS). The...

  • Flood Project
    Flood study

    Muscle Creek Flood Study

    Completed
    Publication date: 30/01/2017
    Site Description Muscle Creek is a major tributary to the Hunter River. It has a catchment area of approximately 92 km2 that extends 14 km to the south-east of the Township of...

  • Flood Project
    Visual Levee Audits

    Muswellbrook Levee - Visual Audit of Urban Levees - Non Tidal Areas of NSW

    Completed
    Publication date: 01/04/2006
    The Dams and Civil Unit of the Department of Commerce has been engaged by the Department of Natural Resources to carry out a visual audit for a number of individual flood levees...

  • Flood Project
    Visual Levee Audits

    Muswellbrook Levee - Audit of Urban Levees Non-Tidal Areas of NSW

    Completed
    Publication date: 01/11/2005
    Muswellbrook is located in the Hunter Valley, approximately 280 km north of Sydney. The town is located on the Hunter River and is protected from flooding by a levee system...

  • Flood Project
    Geotech Report on levee

    Aberdeen & Singleton Levees - Study Report Phase 1

    Completed
    Publication date: 19/07/1999
    The Department of Land and Water Conservation (DLWC) has commissioned Opus International Consultants and Golder Associates to prepare a report highlighting the existing problems...

  • Flood Project
    Environmental Impact Statements

    Muswellbrook - Levee Environmental Impact Statement

    Completed
    Publication date: 01/11/1990
    The area within Muswellbrook most prone to the effects of flooding is that bounded by Bridge Street, the Hunter River and the two bridges over the Hunter River (the study area)....

  • Flood Project
    Flood study

    Hunter Valley No. 1 Mine - Flood Study

    Completed
    Publication date: 01/05/1987
    The work involved in this study consisted of estimation of the peak levels reached by floods of annual exceedance probabilities of 1 in 20, 1 in 50, 1 in 100 and 1 in 500 in the...

  • Flood Project
    Guidance, Tools and Resources

    Hunter Valley - Flood Plain Atlas

    Completed
    Publication date: 01/07/1983
    This shows areas inundated by the 1955 flood in the Hunter River and its tributaries above Maitland, except for the Wollombi Brook, where areas shown flooded are by the 1949...

  • Flood Project
    Guidance, Tools and Resources

    Development Behind Levee Banks - Water Resources Commission

    Completed
    Publication date: 01/10/1982
    Policy: Provided a Levee is built to Commission standards it can be considered that buildings at ground level behind the levee comply with the Government's stated Policy on...

  • Flood Project
    Guidance, Tools and Resources

    Hunter Valley - Effects of Dams on Flood - Levels at Muswellbrook, Singleton...

    Completed
    Publication date: 01/01/1982
    This report summarizes the results of studies undertaken by the Water Resources Commission of N.S.W. to assess the effects of dams on flood levels at Muswellbrook, Singleton and...

  • Flood Project
    Post event flood behaviour reports

    Hunter River Flood Report 1955

    Completed
    Publication date: 01/02/1955
    The Hunter River and tributary streams, comprising Omadale, Moonan, Stewarts and Rouchel Brooks, find their source on the western fringe of the Mount Royal Range which has an...

  • Flood Project
    Flood study

    Shire Roads Flooding Study

    Completed
    Publication date: 11/11/1111
    The Hunter River forms a natural barrier to transport and communication in times of major flood. Consequently, on a geographical basis residents to the west of the Hunter River...

  • Flood Project
    Floodplain Risk Management Study

    Muswellbrook Shire Council - Floodplain Management Study

    Completed
    Publication date: 01/04/1988
    Floodplain management study. A floodplain management committee was formed in Muswellbrook in 1985. The Water Resources Commission, now the Department of Water Resources (DWR)...

  • Flood Project
    Flood study

    Muswellbrook - Flood Study

    Completed
    Publication date: 01/09/1986
    A detailed flood study of flood behaviour on the Hunter River floodplain at Muswellbrook has been undertaken. It is intended that the flood report provide all the relevant...