-
Flood ProjectFloodplain Risk Management Study and Plan
Darlington Point Floodplain Risk Management Study and Plan
CompletedPublication date: 27/10/2021Floodplain Risk Management Study and Plan for Darlington Point, which is located on the floodplain of the Murrumbidgee River. The overall goal of the Floodplain Risk Management...
-
Flood ProjectFlood study
Snowy Monaro Regional Council Flood and Floodplain Risk Management Studies -...
CompletedPublication date: 01/06/2019A flood study for four towns in Snowy Monaro Regional Council - Cooma, Bredbo, Michelago and Berridale undertaken by SMEC and GRC Hydro on behalf of Council. The studies...
-
Flood ProjectFloodplain Risk Management Study and Plan
Review of the Narrandera Floodplain Risk Management Study and Plan and 2023 Addendum
CompletedPublication date: 01/03/2019Study Objectives Narrandera Shire Council commissioned the review of the Narrandera Floodplain Risk Management Study and the Narrandera Floodplain Risk Management Plan for the...
-
Flood ProjectFlood study
Murrumbidgee River at Darlington Point and Environs Flood Study
CompletedPublication date: 12/12/2018The township of Darlington Point is located in the Murrumbidgee LGA in south-western NSW and has a population of 1,016 (2011 census). The town is situated in the floodplain of...
-
Flood ProjectFloodplain Risk Management Study and Plan
Gundagai Floodplain Risk Management Study and Plan
CompletedPublication date: 04/12/2018Following on from the Gundagai Flood Study, the Gundagai FRMS investigated methods to reduce the flood risk in Gundagai.
-
Flood ProjectFloodplain Risk Management Study and Plan
Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and Plan
CompletedPublication date: 13/04/2018Wagga Wagga is located in the Riverina region of NSW. The study area is subject to flooding from the Murrumbidgee River. The Murrumbidgee River traverses the floodplain from...
-
Flood ProjectFlood study
Gundagai Flood Study 2018
CompletedPublication date: 02/03/2018Gundagai is located in southern inland NSW approximately 390 km west south west of Sydney in the Cootamundra-Gundagai Regional Council Local Government Area The township...
-
Flood ProjectFlood study
Narrandera Flood Study Review and Levee Options Assessment
CompletedPublication date: 01/10/2015Narrandera is located on the Murrumbidgee River approximately 140 km downstream of the regional centre of Wagga Wagga. Most of the developed area of the town is located on...
-
Flood ProjectGuidance, Tools and Resources
Hay to Maude - TUFLOW Model Validation for March 2012 Event
CompletedPublication date: 08/08/2013The Murrumbidgee River - Hay to Maude Rural Floodplain Risk Management Study was undertaken by WMAwater. The Flood Study component comprising the establishment of a two...
-
Flood ProjectFloodplain Risk Management Study and Plan
Jeralgambeth Creek at Illabo - Floodplain Risk Management Study and Plan
CompletedPublication date: 01/03/2012Junee Shire Council commissioned the preparation of the Floodplain Risk Management Study (FRMS) and draft Plan for Jeralgambeth Creek at Illabo. The FRMS and draft Plan are set...
-
Flood ProjectPost event flood behaviour reports
Murrumbidgee River - Flood Modelling 2012
CompletedPublication date: 31/01/2012The Wagga Wagga Local Government Area (LGA) is located in the southern inland area of NSW. The study area is surrounded by seven other LGAs, namely Coolamon and Junee to the...
-
Flood ProjectFlood study
Murrumbidgee River - Flood Modelling
CompletedPublication date: 26/09/2011The Wagga Wagga Local Government Area (LGA) is located in the southern inland area of NSW. The study area (depicted in Figure 1) is surrounded by seven other LGAs, namely...
-
Flood ProjectFloodplain Risk Management Study and Plan
Jugiong Floodplain Risk Management Study and Plan
CompletedPublication date: 02/08/2011Jugiong is located in the Riverina district of western NSW. The centre of town lies on either side of Riverside Drive and is mainly concentrated in higher land near the historic...
-
Flood ProjectPost event flood behaviour reports
Review of water management during the 2010 flood events in the Tumut River...
CompletedPublication date: 01/08/2011The Murrumbidgee River rises on the Monaro Plateau. The river initially flows southeast then turns north near Cooma and swings north-northwest through the ACT before entering...
-
Flood ProjectFloodplain Risk Management Study and Plan
Conargo Floodplain Risk Management Study & Plan
CompletedPublication date: 01/07/2010The township of Conargo is located on Billabong Creek in the Lower Murrumbidgee Basin about 35 km north-east of Deniliquin. The overall objectives of the Floodplain Risk...
-
Flood ProjectGuidance, Tools and Resources
Darlington Point - Levee Gradient Sensitivity Analysis
CompletedPublication date: 22/05/2009Darlington Point is located on the banks of the Murrumbidgee River about 40 kilometres south of Griffith. The town has a population of about 900 and is becoming increasingly...
-
Flood ProjectVisual Levee Audits
Hay Levee - Visual Audit of Urban Levees Non Tidal Areas of NSW
CompletedPublication date: 01/03/2007Hay is located in southwestern NSW, approximately 720 km south west of Sydney. The town is located on the Murrumbidgee River and is protected from flooding by a levee system...
-
Flood ProjectFlood study
Moulamein Levee Upgrade Flood Study
CompletedPublication date: 16/04/2006Moulamein is located in south-western New South Wales about 100 kilometres west of Deniliquin. The town is situated at the confluence of the Edward River and Billabong Creek...
-
Flood ProjectFlood study
Narrandera Flood Study - Volume 1 Final Report
CompletedPublication date: 06/12/2000Narrandera is located on the Murrumbidgee River approximately 460 km west of the headwaters. Narrandera itself is a rural shire of approximately 4,177 square kilometres. The...
-
Flood ProjectGuidance, Tools and Resources
Bredbo & The Bidge - Management Strategies For The Murrumbidgee River & Its...
CompletedPublication date: 15/09/1998This report examines changes that have occurred in the Murrumbidgee River and its tributaries. Using this information, future directions are evaluated with a view to developing...