Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

28 Flood Projects found

Tags: Murray River River Basin: 409 - Murray Riverina

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Edward River at Deniliquin Floodplain Risk Management and Plan

    Completed
    Publication date: 28/04/2017
    The Edward River is located in the Riverina region in the south-west of New South Wales. The River is an anabranch of the Murray River, breaking off at Picnic Point and then...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Tooleybuc Floodplain Risk Management Study and Plan

    Completed
    Publication date: 30/01/2017
    The Tooleybuc Floodplain Risk Management Study and Plan was commissioned as part of a combined project for the three Murray River townships of Tooleybuc, Barham and Murray...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Barham Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/01/2017
    The development of a Floodplain Risk Management Plan for Barham follows the completion of the Barham Flood Study in 2014. The Flood Study report (GHD, 2014) documents Murray...

  • Flood Project
    Flood study

    Edward River at Deniliquin Flood Study

    Completed
    Publication date: 13/11/2014
    The Edward River is located in the Riverina region in the south-west of New South Wales. The River is an anabranch of the Murray River, running parallel to it for approximately...

  • Flood Project
    Flood study

    Eight Mile Creek Flood Study

    Completed
    Publication date: 09/03/2012
    The City of Albury is located on the River Murray approximately 600 km south west of Sydney. The catchment of concern is in a future development area to the east of the City....

  • Flood Project
    Flood study

    Albury City to Greater Hume Murray River Flood Study

    Completed
    Publication date: 08/03/2012
    The towns of Albury and Wodonga are located on the NSW and Victorian sides respectively of the Murray River within the study area. Both towns are growing relatively rapidly in...

  • Flood Project
    Floodplain Risk Management Plan

    Wakool River Moama-Moulamein Railway to Gee Gee Bridge - Floodplain Managemen...

    Completed
    Publication date: 01/01/2011
    This Stage 2 floodplain management plan (Stage 2 FMP) has been prepared to provide strategic guidance for the NSW Government agencies and landholders involved in managing...

  • Flood Project
    Flood study

    Murray River Flood Scoping Study

    Completed
    Publication date: 07/05/2010
    There have been three major development projects on the Murray River floodplain at Albury / Wodonga since 2000. The three projects are the Hume Freeway Albury Internal Bypass,...

  • Flood Project
    Floodplain Risk Management Study

    Corowa Howlong & Mulwala - Floodplain Risk Management Study

    Completed
    Publication date: 23/03/2009
    Corowa is situated on the north bank of the Murray River, about 50kms downstream of Albury/Wodonga. Howlong is situated on the north bank of the Murray, 30km downstream of...

  • Flood Project
    Floodplain Risk Management Plan

    Corowa, Howlong & Mulwala Floodplain Risk Management Plan

    Completed
    Publication date: 23/03/2009
    Corowa is situated on the north bank of the Murray River, about 50kms downstream of Albury/Wodonga. Howlong is situated on the north bank of the Murray, 30km downstream of...

  • Flood Project
    Review of Environmental Factors

    South Albury Levee Rehabilitation - Statement of Environmental Effects

    Completed
    Publication date: 01/11/2004
    The Albury City Council proposes to undertake an upgrade of approximately 60 m of riverbank and levee on an anabranch of the Murray River located to the south of the city...

  • Flood Project
    Floodplain Risk Management Plan

    Albury Floodplain Management Plan

    Completed
    Publication date: 09/01/2003
    This report describes the methodology used in preparing the FMP for Albury together with recommendations for further studies and works. Background to the study is provided in...

  • Flood Project
    Floodplain Risk Management Plan

    Moama Floodplain Management Plan

    Completed
    Publication date: 01/09/2002
    The study area was confined to New South Wales, although effects of current development on the Victorian side were taken into account because the primary source of flooding is...

  • Flood Project
    Flood study

    Tuppal and Bullatale Creeks: Data Collection and Flood Study

    Completed
    Publication date: 01/03/2002
    The Tuppal and Bullatale Creeks Data Collection and Flood Study represents the first phase (Phase A) in the preparation of a Floodplain Management Plan for the Murray River...

  • Flood Project
    Floodplain Risk Management Study

    Moama - Floodplain Management Study Proposal for Consultancy Services

    Completed
    Publication date: 01/07/1997
    This proposal for consulting services is submitted by Sinclair Knight Merz in response to a Consultant's Brief for the Moama Floodplain Management Study, June 1997. It is...

  • Flood Project
    Guidance, Tools and Resources

    Murray River - Resolving the Floodplain Management Issues in the Central Murr...

    Completed
    Publication date: 01/05/1997
    The NSW Floodplain (Non-tidal) Management Advisory Committee was established in September 1993 by the former Minister for Land and Water Conservation, the Hon. G. Souris, under...

  • Flood Project
    Guidance, Tools and Resources

    South Albury - Flood Mitigation Strategy

    Completed
    Publication date: 01/05/1993
    A detailed investigation into South Albury flooding which occurred in October 1992 and January 1993 has been undertaken. This report describes the extent and nature of the...

  • Flood Project
    Visual Levee Audits

    Audit of Flood Levees for New South Wales - Town of Tocumwal

    Completed
    Publication date: 01/12/1992
    The town of Tocumwal, located on the Murray River in New South Wales has a population of approximately 1,500. Tocumwal is protected from flooding by a levee system consisting of...

  • Flood Project
    Guidance, Tools and Resources

    Audit of Flood Levees for New South Wales - Town of Barham

    Completed
    Publication date: 01/09/1992
    The audit is designed to appraise the flood security and structural adequacy of the Council constructed levee at Barham. Appraisal of the private levee system is not covered in...

  • Flood Project
    Visual Levee Audits

    Audit for flood levees for New South Wales - Town of Euston

    Completed
    Publication date: 01/09/1992
    The town of Euston is situated in New South Wales on the north bank of the Murray River about 80km southeast of Mildura. It has a population of about 600. The length of levee...