50 Flood Projects found

Tags: Murray River

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Edward River at Deniliquin Floodplain Risk Management and Plan

    Completed
    Publication date: 28/04/2017
    The Edward River is located in the Riverina region in the south-west of New South Wales. The River is an anabranch of the Murray River, breaking off at Picnic Point and then...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Tooleybuc Floodplain Risk Management Study and Plan

    Completed
    Publication date: 30/01/2017
    The Tooleybuc Floodplain Risk Management Study and Plan was commissioned as part of a combined project for the three Murray River townships of Tooleybuc, Barham and Murray...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Barham Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/01/2017
    The development of a Floodplain Risk Management Plan for Barham follows the completion of the Barham Flood Study in 2014. The Flood Study report (GHD, 2014) documents Murray...

  • Flood Project
    Flood study

    Albury Floodplain Risk Management Study and Plan

    Completed
    Publication date: 31/03/2016
    The study area is defined by the Albury Local Government Area and contains the regional city of Albury and its outer suburbs. The city developed as a major transport link...

  • Flood Project
    Flood study

    Edward River at Deniliquin Flood Study

    Completed
    Publication date: 13/11/2014
    The Edward River is located in the Riverina region in the south-west of New South Wales. The River is an anabranch of the Murray River, running parallel to it for approximately...

  • Flood Project
    Flood study

    Tooleybuc Flood Study

    Completed
    Publication date: 07/10/2014
    The Tooleybuc Flood Study has been undertaken to provide the Wakool Shire Council and other stakeholders with an up to date understanding of Murray River flood risks at...

  • Flood Project
    Flood study

    Barham Flood Study

    Completed
    Publication date: 01/10/2014
    "The Barham Flood Study has been undertaken to provide the Wakool Shire Council and other stakeholders with an up to date understanding of Murray River flood risks at Barham....

  • Flood Project
    Flood study

    Eight Mile Creek Flood Study

    Completed
    Publication date: 09/03/2012
    The City of Albury is located on the River Murray approximately 600 km south west of Sydney. The catchment of concern is in a future development area to the east of the City....

  • Flood Project
    Flood study

    Albury City to Greater Hume Murray River Flood Study

    Completed
    Publication date: 08/03/2012
    The towns of Albury and Wodonga are located on the NSW and Victorian sides respectively of the Murray River within the study area. Both towns are growing relatively rapidly in...

  • Flood Project
    Floodplain Risk Management Plan

    Wakool River Moama-Moulamein Railway to Gee Gee Bridge - Floodplain Management Plan

    Completed
    Publication date: 01/01/2011
    This Stage 2 floodplain management plan (Stage 2 FMP) has been prepared to provide strategic guidance for the NSW Government agencies and landholders involved in managing...

  • Flood Project
    Flood study

    Murray River Flood Scoping Study

    Completed
    Publication date: 07/05/2010
    There have been three major development projects on the Murray River floodplain at Albury / Wodonga since 2000. The three projects are the Hume Freeway Albury Internal Bypass,...

  • Flood Project
    Floodplain Risk Management Study

    Corowa Howlong & Mulwala - Floodplain Risk Management Study

    Completed
    Publication date: 23/03/2009
    Corowa is situated on the north bank of the Murray River, about 50kms downstream of Albury/Wodonga. Howlong is situated on the north bank of the Murray, 30km downstream of...

  • Flood Project
    Floodplain Risk Management Plan

    Corowa, Howlong & Mulwala Floodplain Risk Management Plan

    Completed
    Publication date: 23/03/2009
    Corowa is situated on the north bank of the Murray River, about 50kms downstream of Albury/Wodonga. Howlong is situated on the north bank of the Murray, 30km downstream of...

  • Flood Project
    Flood study

    Thurgoona Creek and Albury Airport Flood Study

    Completed
    Publication date: 16/05/2007
    The Albury Airport catchment is to the east of the Albury CBD and is approximately 3.6 square kilometres in area. The hydraulically modelled drainage path begins downstream of...

  • Flood Project
    Visual Levee Audits

    Wagga Wagga Levee - Visual Audit of Urban Levees Non Tidal Areas of NSW

    Completed
    Publication date: 01/03/2007
    Wagga Wagga is located on the Murrumbidgee River in New South Wales, approximately 480 km west from Sydney. The Murrumbidgee River is a major tributary of the Murray River...

  • Flood Project
    Visual Levee Audits

    Barham Levee - Visual Audit of Urban Levees Non Tidal Areas of NSW

    Completed
    Publication date: 01/02/2007
    Barham is located in southwestern NSW, approximately 805 km south west of Sydney. The town is located on the Murray River and is protected from flooding by a levee system...

  • Flood Project
    Flood study

    Moulamein Levee Upgrade Flood Study

    Completed
    Publication date: 16/04/2006
    Moulamein is located in south-western New South Wales about 100 kilometres west of Deniliquin. The town is situated at the confluence of the Edward River and Billabong Creek...

  • Flood Project
    Guidance, Tools and Resources

    River Murray - Floodplain Inundation Model (RiM-FIM) - Hume Dam to Wellington

    Completed
    Publication date: 01/01/2006
    The River Murray Floodplain Inundation Model (RiM-FIM) was created as a research and decision support tool for environmental flow management in the River Murray. The project has...

  • Flood Project
    Flood study

    Lavington Catchment Flood Study (Draft)

    Completed
    Publication date: 01/11/2005
    The Lavington catchment (the study area) lies within the Albury City area to the east of the Albury Central Business District. The study area catchment size is approximately 13...

  • Flood Project
    Flood study

    Thurgoona Creek and Albury Airport Flood Study (Draft)

    Completed
    Publication date: 01/09/2005
    Albury is a regional city which lies on the floodplain of the River Murray at a point several kilometres downstream of Lake Hume. The focus catchment for this study lies two...