-
Flood ProjectFloodplain Risk Management Plan
Warrah Creek - Floodplain Management Plan
CompletedPublication date: 01/02/2012The FMP was developed on the basis of a detailed technical analysis of flood flow and in accordance with the NSW Government’s Floodplain Development Manual (2005). The FMP is...
-
Flood ProjectGuidance, Tools and Resources
Namoi Catchment - Water Resources and Management Overview
CompletedPublication date: 01/02/2011The Namoi River is one of the Murray-Darling Basin's major NSW sub-catch merits. It covers an area of about 42,000 km from the Great Dividing Range near Tamworth to the Barwon...
-
Flood ProjectFloodplain Risk Management Study
Breeza-Caroona Floodplain Management Study - Environmental Assessment Summary
CompletedPublication date: 01/06/2006Environmental Resources Management Australia (ERM) was commissioned by the DLWC to prepare an environmental assessment as part of the development and implementation of the Mooki...
-
Flood ProjectFlood study
Carroll to Boggabri Flood Study and Compendium of Data
CompletedPublication date: 01/03/2003The Study area is located within the Namoi River Basin in northern NSW. It commences at the village of Carroll, downstream of the confluence of the Peel and Namoi Rivers, and...
-
Flood ProjectFloodplain Risk Management Plan
Upper Yarraman Creek Floodplain Management Plan - Phase A Report
CompletedPublication date: 01/11/2002The Yarraman Creek catchment is within the Liverpool Plains. The specific area considered by this study is bounded by the Warrumbungle Range in the south and the Caroona to...
-
Flood ProjectFloodplain Risk Management Study
Warrah Creek/Pump Station Creek Floodplain Management Study
CompletedPublication date: 01/03/2002The Warrah Creek / Pump Station Creek study area is within the Liverpool Plains Catchment and is comprised of three sub-catchment areas: Pump Station Creek; Big Jacks Creek; and...
-
Flood ProjectFloodplain Risk Management Study and Plan
Blackville Floodplain Management Study Report and Plan
CompletedPublication date: 15/01/2001The Mooki River at Caroona has a total catchment area of approximately 202,400 hectares which includes 155,600 hectares in the Warrah Creek and Borambil Creek catchments. The...
-
Flood ProjectFloodplain Risk Management Study
Narrabri Floodplain Management Study
CompletedPublication date: 01/02/1999The town of Narrabri is located within the floodplain of the Namoi River in the north-west of North South Wales. About ten major floods have inundated the town this century. The...
-
Flood ProjectGuidance, Tools and Resources
Guidelines for Namoi Valley Flood Plain Development - Carroll Group
CompletedPublication date: 01/01/1998The Mooki and Namoi Rivers of northern New South Wales join immediately upstream of Gunnedah. A considerable portion of the flood plain of these two rivers is utilised for...
-
Flood ProjectGuidance, Tools and Resources
Cox's Creek Catchment - Hydrogeological Investigation & Dryland Salinity Studies
CompletedPublication date: 01/08/1994A Joint venture between the Department of Water Resources (DWR) and the Soil Conservation Service (SCS) Department of Conservation and Land Management, has led to investigations...
-
Flood ProjectGuidance, Tools and Resources
Mooki River Catchment - Hydrogeological Investigation & Dryland Salinity...
CompletedPublication date: 01/03/1994"A joint venture between the Department of Water Resources, Soil Conservation Service (Department of Conservation and Land Management) and NSW Agriculture has led to...
-
Flood ProjectGuidance, Tools and Resources
Upper Eastern Mooki River Catchment - Hydrogeological Investigation and...
CompletedPublication date: 01/02/1994A joint venture between the Department of Water Resources (DWR) and the Soil Conservation Service (SCS) Department of Conservation and Land Management, has led to investigations...
-
Flood ProjectGuidance, Tools and Resources
Mooki River Floodplain Survey - Breeza - Report A
CompletedPublication date: 01/01/1111SURVEY METHOD The survey was carried out using a 'Trimble' Dual Frequency GPS system in Real Time Kinematic mode. This system applies corrections to the signals received from...