-
Flood ProjectFlood study
Georges River Flood Study 2020
CompletedPublication date: 01/01/2020This flood study was commissioned by Liverpool City and Canterbury-Bankstown Councils to review and update the previous Georges River Flood Study (PWD, 1991). The Study area...
-
Flood ProjectFloodplain Risk Management Study and Plan
Floodplain Risk Management Study and Plan for Sub-Catchments of the Mid Georges River
CompletedPublication date: 21/06/2017Stormwater flood studies have been carried out for the seven sub catchments within the Mid Georges River study area. The primary objective of each of the stormwater flood...
-
Flood ProjectFlood study
Milperra Catchment Draft Flood Study Update
CompletedPublication date: 15/10/2013The purpose of the study is to define flood behaviour throughout the Milperra stormwater catchment, including the analysis of flows within the underground pipe drainage network...
-
Flood ProjectGuidance, Tools and Resources
Freeway No 5 South Western Freeway: Flood Model of Georges River Crossing
CompletedPublication date: 01/03/1985The lower Georges River Valley is subject to widespread flooding from time to time. The Moorebank-Milperra area, which is centred around Milperra Bridge, has been identified as...