8 Flood Projects found

Tags: Liverpool Plains Organisations: NSW Department of Climate Change, Energy, the Environment and Water

Filter Results
  • Flood Project
    Floodplain Risk Management Plan

    Warrah Creek - Floodplain Management Plan

    Completed
    Publication date: 01/02/2012
    The FMP was developed on the basis of a detailed technical analysis of flood flow and in accordance with the NSW Government’s Floodplain Development Manual (2005). The FMP is...

  • Flood Project
    Guidance, Tools and Resources

    Warrah Creek Catchment - Management Study (DRAFT)

    Completed
    Publication date: 01/11/2007
    As part of the continuing process of achieving coordinated Catchment Management throughout the Liverpool Plains Catchment, Evans & Peck were commissioned to undertake the...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Carroll to Boggabri - Rural Floodplain Management Study and Plan - Proposal...

    Completed
    Publication date: 01/05/2003
    The Department of Sustainable Natural Resources is presently seeking Proposals for the preparation of a Rural Floodplain Management Study and Plan for the Namoi River floodplain...

  • Flood Project
    Guidance, Tools and Resources

    Liverpool Plains - Review of Floodplain Management Procedures

    Completed
    Publication date: 01/10/1997
    In June 1994 the NSW FIoodplain (Non-Tidal) Management Advisory Committee delivered its final report (Burton et al., 1994) to the Minister for Land & Water Conservation, the...

  • Flood Project
    Floodplain Risk Management Study

    Upper Coxs Creek - Floodplain Management Study Bundella to Mullaley (DRAFT)

    Completed
    Publication date: 01/12/1996
    This study addresses floodplain development problems in the Upper Coxs Creek between Bundella and Mullaley by presenting a schedule of suggested works and measures to coordinate...

  • Flood Project
    Flood study

    Hydrological Study of Lake Goran - Summary of Study Findings

    Completed
    Publication date: 01/01/1995
    At Lake Goran, a hydrological study has been completed which examined a range of factors that influence water levels in the Lake. These include catchment land use, rainfall...

  • Flood Project
    Guidance, Tools and Resources

    Cox's Creek Catchment - Hydrogeological Investigation & Dryland Salinity Studies

    Completed
    Publication date: 01/08/1994
    A Joint venture between the Department of Water Resources (DWR) and the Soil Conservation Service (SCS) Department of Conservation and Land Management, has led to investigations...

  • Flood Project
    Guidance, Tools and Resources

    Floodplain Management On The Liverpool Plains - Executive Summary - Report...

    Completed
    Publication date: 01/06/1994
    "Our Terms of Reference have required us to review the present administrative arrangements for the resolution of land and water management issues in the Liverpool Plains, to...