-
Flood ProjectFlood study
The Village of Crookwell Flood Study
CompletedPublication date: 01/02/2014The village of Crookwell has a population of about 2,200 and is located about 45 km north of Goulburn on the Crookwell Road. The village is located in the headwaters of the...
-
Flood ProjectFlood study
The Village of Gunning Flood Study
CompletedPublication date: 01/02/2014The Village of Gunning has a population of about 550 and is located on the Hume Highway midway between Yass and Goulburn in the headwaters of the Lachlan Valley. Meadow Creek...
-
Flood ProjectFlood study
The Village of Taralga Flood Study
CompletedPublication date: 01/02/2014Taralga has a population of about 350 and is located on Corroboree Creek which flows in a north-easterly direction through the village area. It drains a small tributary...
-
Flood ProjectFloodplain Risk Management Study
Lachlan River Floodplain Risk Management Study (Gooloogong to Jemalong Gap)
CompletedPublication date: 01/04/2010The study area for the draft FMP incorporates the floodplain area covered by the 1979 Guidelines. It extends from Gooloogong in the east to Jemalong Gap in the Jemalong Range in...
-
Flood ProjectFloodplain Risk Management Study
Cowra and Gooloogong Floodplain Risk Management Study and Plan - Volume One
CompletedPublication date: 01/12/2006The town of Cowra is located in the Lachlan Valley, 220 km south-west of Sydney, on the banks of the Lachlan River. The Lachlan River rises in the Great Dividing Range and...
-
Flood ProjectFlood study
West Cowra Watercourse Flood Study & Drainage Strategy
CompletedPublication date: 02/02/2001The site is located in West Cowra with the watercourse traversing from the Blayney-Demondrille Railway in the south to Grenfell Road in the north. The flooding investigation has...
-
Flood ProjectFlood study
Cowra and Gooloogong Flood Studies
CompletedPublication date: 01/05/1999The flood study is the formal starting process of defining management measures for flood liable land and represents a detailed technical investigation of flood behaviour. This...
-
Flood ProjectFloodplain Risk Management Study and Plan
Forbes - Floodplain Management Report & Draft Floodplain Management Plan
CompletedPublication date: 01/10/1994During 1992 - 1993, the Department of Water Resources carried out a flood study of the town of Forbes. This was carried out in accordance with the provisions of the NSW...