38 Flood Projects found

Tags: Lachlan River

Filter Results
  • Flood Project
    Flood study

    Forbes Flood Study Review

    Completed
    Publication date: 01/05/2020
    The study objectives were to review and update the findings of previous flooding investigations that have been carried out for Forbes. This included the update of flood...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Lachlan River (Condobolin) Floodplain Risk Management Study and Plan

    Completed
    Publication date: 11/11/2018
    Study Objectives Lachlan Shire Council commissioned the Floodplain Risk Management Study and Draft Plan for the town of Condobolin. The overall objectives of the Floodplain Risk...

  • Flood Project
    Flood study

    Ungarie Flood Study

    Completed
    Publication date: 03/05/2017
    The Ungarie Flood Study has been prepared for Bland Shire Council to define the existing flood behaviour in the township of Ungarie and establish the basis for subsequent...

  • Flood Project
    Flood study

    Blayney Flood Study

    Completed
    Publication date: 15/06/2015
    The Town of Blayney is located in the Central West region of New South Wales approximately 240km west of Sydney in the Blayney Shire Council area. Blayney Township (population...

  • Flood Project
    Flood study

    Cowra Overland Flood Study and Plan

    Completed
    Publication date: 31/10/2013
    Overland flooding has been identified as a problem for a number of private properties in Cowra. An assessment of overland flooding was undertaken for two local catchments in...

  • Flood Project
    Floodplain Risk Management Plan

    Lachlan River Jemalong Gap to Condobolin - Floodplain Management Plan

    Completed
    Publication date: 01/02/2012
    The FMP has been prepared to provide strategic guidance to NSW government agencies and landholders in the management of floodwaters on the Lachlan River (Jemalong Gap to...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Emu Creek Floodplain Risk Management Study and Plan (Draft)

    Completed
    Publication date: 01/10/2011
    The study area comprises the Emu Creek floodplain within the urban area of Grenfell and its environs. The catchment area of Emu Creek and its tributaries at Holy Camp Road is 20...

  • Flood Project
    Floodplain Risk Management Study

    Lachlan River Floodplain Risk Management Study (Gooloogong to Jemalong Gap)

    Completed
    Publication date: 01/04/2010
    The study area for the draft FMP incorporates the floodplain area covered by the 1979 Guidelines. It extends from Gooloogong in the east to Jemalong Gap in the Jemalong Range in...

  • Flood Project
    Floodplain Risk Management Study

    Lachlan River Jemalong Gap to Condobolin Floodplain Risk Management Study

    Completed
    Publication date: 01/05/2009
    The Crookwell and Abercrombie Rivers are the main tributaries upstream of Wyangala Dam, situated about 16 km southeast of Cowra. Downstream of the dam, the Boorowa and Belubula...

  • Flood Project
    Flood study

    Condobolin Flood Study

    Completed
    Publication date: 01/06/2008
    Flow patterns in the Lachlan River floodplain are complex, particularly during large flood events. The catchment area to Jemalong Gap is approximately 19,800 square kilometres....

  • Flood Project
    Guidance, Tools and Resources

    Hillston Floodplain Levee - Eastern Levee Hydraulic Model Study MIKE 11...

    Completed
    Publication date: 01/12/2007
    The NSW Department of Commerce (DoC) was commissioned by the Carrathool Shire Council with assistance from the Department of Environment and Climate Change (DECC formerly the...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Canowindra Flood and Floodplain Risk Management Study and Plan (Draft)

    Completed
    Publication date: 01/10/2007
    The town of Canowindra is located on the Belubula River, a major tributary of the Lachlan River. The Belubula River rises in high country to the east of Blaney at elevations of...

  • Flood Project
    Flood study

    Emu Creek Flood Study

    Completed
    Publication date: 08/02/2007
    For the purposes of this study, Emu Creek is assumed to commence at North Street immediately downstream of the junction of Star Gully and Gooloogong Road Tributary. Emu Creek...

  • Flood Project
    Visual Levee Audits

    Oxley Levee - Visual Audit of Urban Levees - Non Tidal Areas of NSW

    Completed
    Publication date: 01/02/2007
    Oxley is located in southwestern NSW, approximately 820 km west of Sydney. The small town is located beside the Lachlan River and is protected from flooding by a levee system...

  • Flood Project
    Floodplain Risk Management Plan

    Lachlan River - Hillston Floodplain Management Plan - Lake Brewster to...

    Completed
    Publication date: 01/10/2005
    The Hillston Floodplain Management Plan Lake Brewster to Whealbah (FMP) has been prepared by the Department of Natural Resources (DNR) in conjunction with the local community....

  • Flood Project
    Floodplain Risk Management Study

    Hillston Floodplain Management Study - Lake Brewster to Whealbah

    Completed
    Publication date: 01/08/2005
    The Lachlan and Willandra Creek floodplains around Hillston are regarded as prime agricultural land and support a successful irrigation and dryland farming industry. The...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Hillston Floodplain Risk Management Study

    Completed
    Publication date: 08/06/2005
    Carrathool Shire Council, through the Hillston Floodplain Management Committee, is developing a floodplain risk management strategy and plan for the town of Hillston. The...

  • Flood Project
    Flood study

    Canowindra Flood Study

    Completed
    Publication date: 01/02/2004
    The study area includes the Belubula River and its floodplain from 0.5km upstream of Cherry Tree Falls Bridge on Mandurama Road (MR 7511) to 1km downstream of the former Cowra...

  • Flood Project
    Floodplain Risk Management Study

    Lachlan River Floodplain Management Study (Gooloogong to Jemalong Gap) - Phase A

    Completed
    Publication date: 19/11/2003
    The study area for the Lachlan Floodplain Management Plan incorporates the floodplain area covered by the existing Guidelines. The study area for the Lachlan Floodplain...

  • Flood Project
    Flood study

    Lachlan River (Jemalong Gap to Condobolin) Rural Flood Study

    Completed
    Publication date: 01/10/2003
    The lower Lachlan Valley is one of New South Wales' major irrigation developments. The study area for the Lachlan River Floodplain Management Plan extends from Jemalong Gap in...