Flood ProjectFloodplain Risk Management Study and Plan
Lower Macleay River Floodplain Risk Management Study and Plan
CompletedPublication date: 29/08/2024The Lower Macleay River floodplain occupies approximately 500km2 of coastal floodplain downstream of Kempsey, to the Macleay River’s main outlet at South West Rocks. The...
-
Flood ProjectFloodplain Risk Management Study
Kempsey CBD Floodplain Risk Management Study
CompletedPublication date: 28/05/2017The Macleay River catchment covers an area of approximately 11500 square kilometres; the upper reaches of which are located within the New England Tablelands. The main...
-
Flood ProjectFloodplain Risk Management Plan
Kempsey CBD Floodplain Risk Management Plan
CompletedPublication date: 28/05/2017The Macleay River catchment covers an area of approximately 11500 square kilometres; the upper reaches of which are located within the New England Tablelands. The objective of...
-
Flood ProjectFlood study
Kempsey Hydraulic Model Tuflow Update
CompletedPublication date: 01/12/2016At the commencement of the Kempsey CBD Floodplain Risk Management Study and Plan it was decided to convert Council’s existing flood model to a TUFLOW model. It was considered...
-
Flood ProjectPost event flood behaviour reports
Northern Rivers NSW - Flood Summary May 2009
CompletedPublication date: 28/02/2011This report was commissioned by the New South Wales Department of Environment, Climate Change and Water (DECCW) in collaboration with State Emergency Service (SES) to summarise...
-
Flood ProjectFlood study
Kempsey Flood Study Hydraulic Modelling Report
CompletedPublication date: 01/08/2009The central business district (CBD) of Kempsey is sited on a natural overbank flow path of the Macleay River and is prone to severe flooding during floods in the order of the...
-
Flood ProjectGuidance, Tools and Resources
Kempsey Levee Gradient Sensitivity Assessment
CompletedPublication date: 01/03/2008Levees are the main form of flood protection afforded to a number of regional NSW towns situated on major rivers. Levee designs have typically been based on actual historic peak...
-
Flood ProjectGuidance, Tools and Resources
Macleay River at Kempsey - Geomorphologic Assessment
CompletedPublication date: 01/03/2008There have been a number of studies previously undertaken on the bed dynamics and geomorphology of the lower Macleay River and its floodplain. These include broader assessments...
-
Flood ProjectGuidance, Tools and Resources
Macleay - Floodplain Survey
CompletedPublication date: 01/02/2007The Kempsey Local Emergency Management Committee had for some time been considering issues relating to flooding of the Lower Macleay Floodplain. Increasing development on the...
-
Flood ProjectFloodplain Risk Management Plan
Lower Macleay Floodplain Management Plan - Supplementary Report Covering the...
CompletedPublication date: 01/07/2004The Macleay River catchment covers some 11,500 square kilometres. The main tributaries, including the Aspley, Muddy and Chandler Rivers, rise in the Great Dividing Range and...
-
Flood ProjectFlood study
Factors Affecting the Growth Of Flood Damage in NSW - Vol 2 - Flood Damage...
CompletedPublication date: 01/06/1991This document completed by Water Studies Pty Ltd for the Department of Public Works and Water Resources New South Wales. Volume 2 of Factors affecting the growth of flood damage...