5 Flood Projects found

Tags: Junee

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Jeralgambeth Creek at Illabo - Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/03/2012
    Junee Shire Council commissioned the preparation of the Floodplain Risk Management Study (FRMS) and draft Plan for Jeralgambeth Creek at Illabo. The FRMS and draft Plan are set...

  • Flood Project
    Post event flood behaviour reports

    Murrumbidgee River - Flood Modelling 2012

    Completed
    Publication date: 31/01/2012
    The Wagga Wagga Local Government Area (LGA) is located in the southern inland area of NSW. The study area is surrounded by seven other LGAs, namely Coolamon and Junee to the...

  • Flood Project
    Flood study

    Murrumbidgee River - Flood Modelling

    Completed
    Publication date: 26/09/2011
    The Wagga Wagga Local Government Area (LGA) is located in the southern inland area of NSW. The study area (depicted in Figure 1) is surrounded by seven other LGAs, namely...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Lower Butlers Gully Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/03/2011
    The Lower Butlers Gully catchment is the largest of the study catchments and rises in the foothills to the south of town. It has a total catchment area of about 37 square...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Lower Butlers Gully Flood Study

    Completed
    Publication date: 01/06/2009
    The Lower Butlers Gully catchment has a total area of about 37 square kilometres (inclusive of the tributaries) at the downstream end of the study area. Upstream of William...