9 Flood Projects found

Tags: Hume Highway

Filter Results
  • Flood Project
    Geotech Report on levee

    South Albury Levee Upgrade and Feasibility

    Completed
    Publication date: 21/08/2018
    The Albury City Floodplain Risk Management Study and Plan was adopted by Council in February 2016. One of the key recommendations from the Plan is that a feasibility study of an...

  • Flood Project
    Flood study

    Gundagai Flood Study 2018

    Completed
    Publication date: 02/03/2018
    Gundagai is located in southern inland NSW approximately 390 km west south west of Sydney in the Cootamundra-Gundagai Regional Council Local Government Area The township...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Gibbergunyah Creek Floodplain Risk Management Study and Draft Plan

    Completed
    Publication date: 27/09/2016
    Gibbergunyah Creek catchment is located in Wingecarribee Shire Southern Highlands of NSW 130 km south west of Sydney. The catchment is part of the Nattai River catchment which...

  • Flood Project
    Flood study

    The Village of Gunning Flood Study

    Completed
    Publication date: 01/02/2014
    The Village of Gunning has a population of about 550 and is located on the Hume Highway midway between Yass and Goulburn in the headwaters of the Lachlan Valley. Meadow Creek...

  • Flood Project
    Flood study

    Culcairn, Henty, Holbrook Flood Studies

    Completed
    Publication date: 30/09/2013
    The Culcairn, Henty and Holbrook Flood Studies (the studies) were initiated as a result of flooding of residential areas, most notably in October and December 2010 but also in...

  • Flood Project
    Flood study

    Lansdowne Catchment Flood Study

    Completed
    Publication date: 01/03/2013
    The Lansdowne study area is located in south west Sydney and consists of part of the Lansdowne suburb and parts of the Georges Hall and Bass Hill suburbs. The study area is...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Bowral Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/08/2005
    The study area encompasses a substantial portion of the township of Bowral. Bowral township is located 5km off the Hume Highway, 115km south-west of Sydney. The town is situated...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Bowral Floodplain Risk Management Study and Plan (Draft)

    Completed
    Publication date: 04/05/2005
    The study area encompasses a substantial portion of the township of Bowral. Bowral township is located 5km off the Hume Highway, 115km south-west of Sydney. The town is situated...

  • Flood Project
    Environmental Impact Statements

    Hume Highway Yass Traffic Relief Route (Including Barton Highway Connection)

    Completed
    Publication date: 01/03/1989
    The Roads and Traffic Authority of NSW (previously the Department of Main Roads) proposes to construct a Traffic Relief Route for the Hume Highway (State Highway No 2) at Yass,...