-
Flood ProjectFloodplain Risk Management Study and Plan
St Marys (Byrnes Creek) Catchment Floodplain Risk Management Study and Plan
CompletedPublication date: 23/03/2020Introduction Lyall & Associates has been commissioned to prepare the St Marys (Byrnes Creek) Catchment Floodplain Risk Management Study and Plan (FRMS&P) on behalf of...
-
Flood ProjectFlood study
Little Creek Catchment Overland Flow Flood Study
CompletedPublication date: 01/06/2017The Little Creek catchment is located north of the M4 Motorway and drains to South Creek with the study area covering parts of the suburbs of Oxley Park, Colyton, St Marys and...
-
Flood ProjectFloodplain Risk Management Study and Plan
Lapstone, South Glenbrook and South Blaxland Floodplain Risk Management...
CompletedPublication date: 17/06/2015The study area comprises an area of 5.4 square kilometres to the south of the Great Western Highway, including parts of the suburbs of Lapstone, Glenbrook and Blaxland. Ground...
-
Flood ProjectGuidance, Tools and Resources
Road Evacuation Route Upgrade Strategy Local Hydraulics Specification Study...
CompletedPublication date: 06/03/2002This Study investigated the hydraulic capacity of ten (10) low points identified in the road network used for emergency flood evacuation in the Emu Plains area. The Emu Plains...
-
Flood ProjectGuidance, Tools and Resources
Bathurst - Computer Based Floodplain Model - Final Report
CompletedPublication date: 01/06/1993This report was prepared in response to a brief issued by the Bathurst City Council entitled "Computer Based Floodplain Model - Contract No. T3-59/89" dated 22 December 1969 in...
-
Flood ProjectFloodplain Risk Management Plan
Bathurst - Floodplain Management Plan
CompletedPublication date: 01/03/1993The City of Bathurst has experienced varying degrees of flooding during its history as a result of flooding of the Macquarie River and its tributaries. Severe flooding was most...