Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

breadcrumb banner

8 Flood Projects found

Tags: Flood Study River Basin: 421 - Macquarie-Bogan

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Quambone Floodplain Risk Management Study and Plan

    Completed
    Publication date: 07/07/2021
    Quambone (population 247 and 50 dwellings) is located approximately 55 km west of Coonamble, in the Central West Region of NSW. The Village of Quambone, declared on 28 July...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Blackmans Swamp Creek and Ploughmans Creek Flood Risk Management Study and Plan

    Completed
    Publication date: 01/12/2020
    Study Objectives Orange City Council (Council) commissioned the preparation of the Blackmans Swamp Creek and Ploughmans Creek Flood Study (Flood Study) and the Blackmans Swamp...

  • Flood Project
    Flood study

    Bogan River at Nyngan Flood Study

    Completed
    Publication date: 10/09/2014
    The township of Nyngan is surrounded by flood protection levees. In 1990, Bogan River floodwater overtopped the levees and inundated the town. The flood caused millions of...

  • Flood Project
    Flood study

    Blackmans Swamp Creek Flood Study

    Completed
    Publication date: 01/02/2005
    Blackman’s Swamp Creek is the major drainage catchment of the City of Orange. The catchment rises on the south eastern side of the city and flows through the city’s Central...

  • Flood Project
    Flood study

    Georges Plains & Sofala Flood Scoping Study - Final Report: Georges Plains

    Completed
    Publication date: 01/12/2003
    The village of Georges Plains is located on Georges Plains Creek, which has a catchment area of just under 70 square kilometres and is a tributary of Queen Charlottes Vale Creek...

  • Flood Project
    Flood study

    Macquarie River, Bathurst - August 1998 Flood Investigation and Model Review

    Completed
    Publication date: 01/06/2000
    The catchment area of the Macquarie River upstream of Bathurst is 2,897 square kilometres. The total catchment area of this study, which extends to Eglinton, is 2,936 square...

  • Flood Project
    Flood study

    Talbragar River Supplementary Flood Study

    Completed
    Publication date: 01/01/1999
    This study was commissioned by Dubbo City Council to assist in the preparation of a Local Environmental Plan for Dubbo. The primary objectives of the study were as follows:...

  • Flood Project
    Flood study

    Mudgee Flood Study

    Completed
    Publication date: 01/11/1998
    This report describes the results of a detailed Flood Study for Mudgee. The study identifies the nature and extent of the flooding problem in Mudgee. An earlier reconnaissance...