Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

breadcrumb banner

18 Flood Projects found

Tags: Flood Study Organisations: Wollongong City Council

Filter Results
  • Flood Project
    Flood study

    Kully Bay Overland Flow Study

    Completed
    Publication date: 23/10/2019
    The Kully Bay catchment is located in the suburb of Warrawong, in the Wollongong City LGA. The catchment covers an area of approximately 150 hectares and extends from the...

  • Flood Project
    Flood study

    Minnegang Creek Flood Study

    Completed
    Publication date: 23/10/2019
    The Minnegang Creek Catchment is located approximately 7km south of Wollongong. The Minnegang Creek Catchment is approximately 90 hectares in size and is largely developed and...

  • Flood Project
    Flood study

    Duck Creek Flood Study

    Completed
    Publication date: 31/05/2019
    The Duck Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Duck Creek catchment and establish the basis for...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Allans Creek Flood Study, Allans Creek Floodplain Risk Management Study, Alla...

    Completed
    Publication date: 05/09/2008
    A flood study of the Allans Creek catchment was undertaken to define the nature and extent of flooding in the study area for a range of design rainfall events. As part of the...

  • Flood Project
    Floodplain Risk Management Study

    Allans Creek Floodplain Risk Management Study (Revised)

    Completed
    Publication date: 01/09/2006
    The Allans Creek catchment has an area of 42 square kilometres. The catchment lies to the south west of the Wollongong CBD and rises up to the Illawarra escarpment. The...

  • Flood Project
    Flood study

    Allans Creek - Proposed Welded Products Plant Flood Study

    Completed
    Publication date: 01/01/1990
    Council has requested that BHP prepare a study of the effects on flooding of the proposed development. The HEC2 backwater model of Allan's Creek, prepare by Kinhill, has been...

  • Flood Project
    Flood study

    A Flood Study of Macquarie Rivulet

    Completed
    Publication date: 01/10/1988
    This flood study of Macquarie Rivulet involves the evaluation of peak flood discharge estimates, for various average recurrence intervals. The catchment area of the Macquarie...

  • Flood Project
    Flood study

    Combined Catchments of Whartons, Collins and Farrahars Creeks, Bellambi Gully...

    Superseded
    Publication date: 30/03/2011
    The contiguous catchments of Whartons, Collins, Farrahars Creeks, Bellambi Gully and Bellambi Lake are located between 6 and 10 km north of the Wollongong Central Business...

  • Flood Project
    Flood study

    Mullet & Brooks Creeks Flood Study

    Superseded
    Publication date: 01/03/2010
    Mullet Creek drains a relatively small catchment of 74.48 square kilometres. The creek rises at the escarpment (often sandstone cliffs) at an elevation of about 600m AHD and...

  • Flood Project
    Flood study

    Fairy and Cabbage Tree Creeks Flood Study

    Superseded
    Publication date: 04/02/2010
    Fairy and Cabbage Tree Creeks drain a relatively small catchment of 2074 ha or 20.74 square kilometres. The catchments of the tributary streams rise from the beach area (near...

  • Flood Project
    Flood study

    Allans Creek Flood Study Addendum 2 - Darragh Drive, Figtree

    Superseded
    Publication date: 05/08/2009
    Darragh Drive is located in the suburb of Figtree, which includes Allans Creek. Brandy and Water Creek, a tributary of American Creek, runs along the rear of the properties on...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Mullet and Brooks Creeks Floodplain Risk Management Study & Plan (Draft)

    Superseded
    Publication date: 01/08/2007
    The study area comprises two catchments, Mullet Creek and Brooks Creek, which drain areas of about 72 square kilometres and 5 square kilometres, respectively. Both watercourses...

  • Flood Project
    Flood study

    Allans Creek Flood Study (Revised)

    Superseded
    Publication date: 01/09/2006
    The Allans Creek catchment has an area of 42 square kilometres. The catchment lies to the south west of the Wollongong CBD and rises up to the Illawarra escarpment. The...

  • Flood Project
    Flood study

    Allans Creek Flood Study

    Superseded
    Publication date: 08/10/2003
    The Allans Creek catchment has an area of 42 square kilometres. The catchment lies to the south west of the Wollongong CBO and rises up to the IlIawarra escarpment. The...

  • Flood Project
    Flood study

    Hewitts Creek Incorporating Slacky, Tramway, Woodlands & Thomas Gibson Creeks...

    Superseded
    Publication date: 01/12/2002
    The study catchment forms part of the Northern Wollongong coastal sub-basin and incorporates the subsidiary catchments of Slacky, Tramway, Woodlands, Hewitts and Thomas Gibsons...

  • Flood Project
    Flood study

    Minnegang Creek Flood Study

    Superseded
    Publication date: 18/10/2002
    Minnegang Creek is situated approximately 8.5 km south of Wollongong. Significant flooding has previously occurred within parts of the Minnegang Creek catchment. Halliburton KBR...

  • Flood Project
    Flood study

    Lake Illawarra Flood Study

    Superseded
    Publication date: 30/07/2001
    Lake lllawarra is a shallow coastal lagoon located on the undulating coastal plain between the ocean and the cliffs of the lllawarra Escarpment. The Lake lllawarra Catchment has...

  • Flood Project
    Flood study

    Allans Creek Flood Study Compendium of Data

    Superseded
    Publication date: 01/06/1991
    Allans Creek rises in the steep escarpment located to the west of the city of Wollongong. It is composed of three main tributaries; American, Byarong and Charcoal Creeks. The...