    Floodplain Risk Management Study and Plan

    Gulargambone Floodplain Risk Management Study and Plan

    Completed
    Publication date: 07/07/2021
    The Study Area for Gulargambone is located at the confluence of the Castlereagh River (catchment area 7,000 km2 at the confluence) and Gulargambone Creek (catchment area 600 km2...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Quambone Floodplain Risk Management Study and Plan

    Completed
    Publication date: 07/07/2021
    Quambone (population 247 and 50 dwellings) is located approximately 55 km west of Coonamble, in the Central West Region of NSW. The Village of Quambone, declared on 28 July...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Blackmans Swamp Creek and Ploughmans Creek Flood Risk Management Study and Plan

    Completed
    Publication date: 01/12/2020
    Study Objectives Orange City Council (Council) commissioned the preparation of the Blackmans Swamp Creek and Ploughmans Creek Flood Study (Flood Study) and the Blackmans Swamp...

  • Flood Project
    Flood study

    Wianamatta (South) Creek Catchment Flood Study - Existing Conditions

    Completed
    Publication date: 25/11/2020
    The Wianamatta (South) Creek Catchment Flood Study Existing Conditions (2020) report updates and extends a previous study prepared for Penrith City Council in association with...

  • Flood Project
    Flood study

    Forbes Flood Study Review

    Completed
    Publication date: 01/05/2020
    The study objectives were to review and update the findings of previous flooding investigations that have been carried out for Forbes. This included the update of flood...

  • Flood Project
    Flood study

    Eden, Twofold Bay, Towamba River Flood Study

    Completed
    Publication date: 29/04/2020
    The Eden, Twofold Bay and Towamba River Flood Study has been prepared for Bega Valley Shire Council to define the existing flood behaviour in the catchment and establish the...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Louth Flood Study and Floodplain Risk Management Study & PLan

    Completed
    Publication date: 01/03/2020
    Study Objectives Bourke Shire Council (Council) commissioned the preparation of the Louth Flood Study (Flood Study) and the Floodplain Risk Management Study and Plan for the...

  • Flood Project
    Flood study

    Lake Illawarra, Mt Warrigal and Oak Flats Flood Study

    Completed
    Publication date: 23/12/2019
    The Lake Illawarra, Mt Warrigal and Oak Flats Flood Study has been prepared for Shellharbour City Council (Council) to define the existing flood behaviour in the Lake Illawarra,...

  • Flood Project
    Flood study

    Lower Macleay Flood Study

    Completed
    Publication date: 22/11/2019
    The Lower Macleay River floodplain occupies an approximately 500km2 of coastal floodplain downstream of Kempsey, to the Macleay River’s main outlet at South West Rocks. The...

  • Flood Project
    Flood study

    Kully Bay Overland Flow Study

    Completed
    Publication date: 23/10/2019
    The Kully Bay catchment is located in the suburb of Warrawong, in the Wollongong City LGA. The catchment covers an area of approximately 150 hectares and extends from the...

  • Flood Project
    Flood study

    Minnegang Creek Flood Study

    Completed
    Publication date: 23/10/2019
    The Minnegang Creek Catchment is located approximately 7km south of Wollongong. The Minnegang Creek Catchment is approximately 90 hectares in size and is largely developed and...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Braidwood Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/08/2019
    Study Objectives Queanbeyan-Palerang Regional Council commissioned the Floodplain Risk Management Study and Plan (FRMS&P)for the township of Braidwood. The overall...

  • Flood Project
    Flood study

    Temora Flood Study

    Completed
    Publication date: 14/06/2019
    The Temora Flood Study was commissioned by Temora Shire Council and the NSW state government to define the existing flood behaviour in the township of Temora; including the open...

  • Flood Project
    Flood study

    Ingleside, Elanora and Warriewood Overland Flow Flood Study (2019)

    Completed
    Publication date: 13/06/2019
    The Ingleside, Elanora and Warriewood Overland Flow Flood Study catchment area includes the suburbs of North Narrabeen, Warriewood, Elanora Heights and part of Ingleside. The...

  • Flood Project
    Flood study

    Duck Creek Flood Study

    Completed
    Publication date: 31/05/2019
    The Duck Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Duck Creek catchment and establish the basis for...

  • Flood Project
    Flood study

    Peach Tree and Lower Surveyors Creek Flood Study

    Completed
    Publication date: 01/04/2019
    The Peach Tree and Lower Surveyors Creeks Flood Study covers an area of 1,250 hectares within the Penrith City Council Local Government Area (LGA). As shown in Figure 1, the...

  • Flood Project
    Flood study

    Murrumbidgee River at Darlington Point and Environs Flood Study

    Completed
    Publication date: 12/12/2018
    The township of Darlington Point is located in the Murrumbidgee LGA in south-western NSW and has a population of 1,016 (2011 census). The town is situated in the floodplain of...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Lachlan River (Condobolin) Floodplain Risk Management Study and Plan

    Completed
    Publication date: 11/11/2018
    Study Objectives Lachlan Shire Council commissioned the Floodplain Risk Management Study and Draft Plan for the town of Condobolin. The overall objectives of the Floodplain...

  • Flood Project
    Flood study

    Birds Gully and Bunnerong Road Flood Study

    Completed
    Publication date: 21/06/2018
    This flood study was prepared by WMAwater on behalf of the Randwick City Council and Bayside Council. The study was commissioned by the Randwick City Council and Bayside Council...

  • Flood Project
    Flood study

    Barellan Flood Study

    Completed
    Publication date: 19/03/2018
    Barellan is located in the Riverina region of south-west NSW. The closest city is Griffith located approximately 50 km to the west. The town of Ardlethan lies some 30 km to the...