-
Flood ProjectGuidance, Tools and Resources
Coonamble Levee - Flood Affection to Properties Due to Failure
CompletedPublication date: 01/06/2010The objective of this study was to assess flood affection to properties located inside Coonamble Levee due to two levee breach scenarios, with two design floods investigated for...
-
Flood ProjectFlood study
Rural Flood Study Darling River Floodplain - Bogan River Confluence to Louth
CompletedPublication date: 02/12/2009The Darling River Floodplain (Bogan River confluence to Louth) study area is located within the Darling River Valley floodplain. The study area stretches approximately 130...
-
Flood ProjectGeotech Report on levee
Coonamble Town Levee - Report on Levee Bank Assessment
CompletedPublication date: 08/02/2007This report documents the results of a geotechnical investigation of Coonamble Town Levee and the resulting recommendations for a program of repairs to the earthfill levee. It...
-
Flood ProjectFlood study
Coonamble Flood Scoping Study
CompletedPublication date: 01/12/2002This study was commissioned by the Department of Land and Water Conservation (DLWC) to review the issues associated with flooding at Coonamble, NSW. It is funded through...
-
Flood ProjectPost event data collection
Coonamble Levee - Flood Levels
CompletedPublication date: 01/08/1994Water Resources Consulting Services was commissioned by the NSW Public Works Dams and Civil Section to determine the design levee crest levels to Australian Height Datum (AHD),...
-
Flood ProjectVisual Levee Audits
Audit of Flood Levees for NSW - Town of Coonamble
CompletedPublication date: 01/12/1992The town of Coonamble on the Castlereagh River in New South Wales has a population of about 1200. It is protected from flooding by a ring levee with a total length of...
-
Flood ProjectFloodplain Risk Management Study
Castlereagh Valley - Flood Plain Management Studies
CompletedPublication date: 01/03/1983In January 1981, Rankine and Hill Pty. Ltd. were engaged to undertake the study for the Castlereagh Valley and a draft of this report was completed in April 1982. The terms of...