-
Flood ProjectFlood study
Nepean River Flood Study
CompletedPublication date: 15/04/2015The study area defined by Council is as follows: The Nepean River from Menangle Weir (4.5 kilometres upstream of Camden Council’s LGA boundary) to the river’s confluence with...
-
Flood ProjectGuidance, Tools and Resources
Camden - Flood Risk Management Policy
CompletedPublication date: 10/04/2006The Flood Risk Management Policy establishes flood risk management planning and development procedures for all flood prone land within the Camden Local Government Area (LGA)....
-
Flood ProjectFloodplain Risk Management Plan
Upper Nepean River Floodplain Management Study and (Draft) Plan (Volume 3)
CompletedPublication date: 01/11/2000Flooding is a relatively frequent occurrence in the Upper Nepean valley. Periodically, water from the Nepean River flows across the floodplains and into low lying areas of the...
-
Flood ProjectGuidance, Tools and Resources
Warragamba - Flood Frequency & Flood Modelling Studies
CompletedPublication date: 01/10/1992This report describes the work that has been carried out by Webb, McKeown & Associates from April, 1992, in accordance with a Brief dated 16 April, 1992 issued by the...
-
Flood ProjectGuidance, Tools and Resources
Camden Area - Flood Prone Land Study
CompletedPublication date: 01/10/1992The Camden Area Flood Prone Land Study was commenced in February 1992. The brief required the definition of potential flooding, before and after mining subsidence, and the...
-
Flood ProjectFlood study
Upper South Creek Flood Study
CompletedPublication date: 01/05/2012Flood Study Final Report The Upper South Creek Catchment lies within Camden City Council’s Local Government Area. Within the defined study area (i.e. from the head waters to as...
-
Flood ProjectFloodplain Risk Management Study and Plan
Upper Nepean River Floodplain Management Study and Plan
CompletedPublication date: 01/04/2001Flooding is a relatively frequent occurrence in the Upper Nepean valley. Periodically, water from the Nepean River flows across the floodplains and into low lying areas of the...
-
Flood ProjectFlood study
Upper Nepean River Flood Study
CompletedPublication date: 01/09/1995The streams investigated in this study included the 52.2 km reach of the Upper Nepean River from Menangle Bridge to the Warragamba River junction, as well as the following...
-
Flood ProjectFlood study
Camden Flood Study Report
CompletedPublication date: 01/06/1986Camden, with a population of approximately 15,000, is a major urban centre servicing the surrounding rural area. tt is anticipated that the area will face substantial growth in...
-
Flood ProjectFloodplain Risk Management Study
Camden Floodplain Management Strategy Study
CompletedPublication date: 01/03/1985The Nepean River and its headwater tributaries, the Avon, Cordeaux and Cataract Rivers, rise in the Illawarra Range to the west of Wollongong at an elevation of about 500 in....
-
Flood ProjectPost event flood behaviour reports
Camden, Penrith - Report on the 1867 Flood
CompletedPublication date: 01/01/1985This report presents an estimate 16,600 cubic metres per second for the peak flow rate in the Warragamba Gorge during the flood on or around the 22nd of June 1867. The method...