-
Flood ProjectFlood study
Alexandra Canal Flood Study
CompletedPublication date: 26/05/2017The purpose of this Flood Study is to identify local overland flow as well as mainstream flow and define existing flood liability. This objective is achieved through the...
-
Flood ProjectFlood study
Canterbury LGA Cooks River Catchment: Final Overland Flow Study
CompletedPublication date: 19/04/2016The Cooks River Catchment study area is approximately 27 square kilometres of urbanised catchment. The study area includes Cup and Saucer Creek and Cooks River, as well as Omaha...
-
Flood ProjectFlood study
Botany Bay Foreshore Beach Catchment Flood Study
CompletedPublication date: 15/12/2015The catchment area is approximately 3.5 km2. The eastern side of the catchment drains to Sir Joseph Banks Park and the western side drains to Mill Stream in the west, before...
-
Flood ProjectFlood study
Sans Souci Flood Study
CompletedPublication date: 14/09/2015The study area is bounded by Rocky Point Road in the west which is a localised high point and Rockdale City Council boundary. The northern extent of the study area is formed by...
-
Flood ProjectFloodplain Risk Management Study and Plan
Cooks River Floodplain Risk Management Study and Plan
CompletedPublication date: 01/02/2015The Cooks River drains a catchment of approximately 100 square kilometres in the south-western suburbs of Sydney. The river originates as a small watercourse near the Chullora...
-
Flood ProjectFlood study
Kogarah Bay Creek - Flood & Overland Flow Study
CompletedPublication date: 01/12/2008Kogarah Bay Creek is a 2.8 km2 catchment which drains into Kogarah Bay forming part of the Georges River estuary feeding into Botany Bay. The catchment area is predominantly...
-
Flood ProjectGuidance, Tools and Resources
Cooks River - Stormwater Management Plan
CompletedPublication date: 22/09/1999"The 13 Local Councils of the Cooks River catchment, working together with State Authorities and the community, have prepared a Stormwater Management Plan for the Cooks River....
-
Flood ProjectGuidance, Tools and Resources
Georges River - Mathematical Modelling Study
CompletedPublication date: 01/02/1992This report discusses the construction, calibration and verification of a tidal model of the Georges River estuary from its mouth at Dolls Point to Liverpool Weir using the MIKE...