7 Flood Projects found

Tags: Belubula River River Basin: 412 - Lachlan

Filter Results
  • Flood Project
    Flood study

    Blayney Flood Study

    Completed
    Publication date: 15/06/2015
    The Town of Blayney is located in the Central West region of New South Wales approximately 240km west of Sydney in the Blayney Shire Council area. Blayney Township (population...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Canowindra Flood and Floodplain Risk Management Study and Plan (Draft)

    Completed
    Publication date: 01/10/2007
    The town of Canowindra is located on the Belubula River, a major tributary of the Lachlan River. The Belubula River rises in high country to the east of Blaney at elevations of...

  • Flood Project
    Floodplain Risk Management Plan

    Cowra and Gooloogong Floodplain Risk Management Study & Plan

    Completed
    Publication date: 01/12/2006
    The Lachlan River rises in the Great Dividing Range and drains to the south and west with a catchment area at Cowra of 11,000 square kilometres. The upper catchment is situated...

  • Flood Project
    Flood study

    Canowindra Flood Study

    Completed
    Publication date: 01/02/2004
    The study area includes the Belubula River and its floodplain from 0.5km upstream of Cherry Tree Falls Bridge on Mandurama Road (MR 7511) to 1km downstream of the former Cowra...

  • Flood Project
    Guidance, Tools and Resources

    Wetlands Water Management Strategy for the Lachlan River Valley - Progress Report

    Completed
    Publication date: 01/04/1986
    This document outlines the scope and progress of work being undertaken by the Water Resources Commission, with the assistance of the National Parks and Wildlife Service, to...

  • Flood Project
    Guidance, Tools and Resources

    Belubula River - Stream Clearing Investigation

    Completed
    Publication date: 01/09/1984
    This report covers the results of an investigation of possible stream clearing works to reduce flooding on the Belubula River, undertaken during September 1984. Some 36 km of...

  • Flood Project
    Flood study

    A Proposal for Flood Mitigation on the Belubula River Flood Plain

    Completed
    Publication date: 11/11/1111
    This report outlines a proposal for flood mitigation on the Belubula River Flood Plain prepared by the Water Resources Commission. This report provides details of a flood...