-
Flood ProjectFlood study
Review of Moree and Environs Flood Study / Floodplain Risk Management Study...
CompletedPublication date: 25/01/2017WRM Water & Environment Pty Ltd (WRM) was commissioned by Moree Plains Shire Council (MPSC) to review the Moree and Environs Flood Study/Floodplain Risk Management Study and...
-
Flood ProjectFloodplain Risk Management Plan
Mungindi Floodplain Risk Management Plan
CompletedPublication date: 07/04/2015The general area of Mungindi is located within the Border Rivers catchment on the Barwon River floodplain. The town itself lies on the Carnarvon Highway, 120 km north-west of...
-
Flood ProjectGuidance, Tools and Resources
Floristic Assessment of the Lower Macquarie River
CompletedPublication date: 01/09/2010This report describes the results of a floristic assessment of the lower Macquarie River. The floristic assessment was undertaken along the Macquarie River from the end of the...
-
Flood ProjectPost event flood behaviour reports
Mungindi Levee Flood Analysis
CompletedPublication date: 15/06/2009Mungindi is located on the Barwon River, on the New South Wales - Queensland border. That part of the township south of the river lies in the Moree Plains Shire Council Local...
-
Flood ProjectFlood study
Flood Study for Boomi
CompletedPublication date: 18/03/2004This report provides the Flood Study component of the floodplain risk management process and details the investigation of flood behaviour associated with the ‘urban’ area of...
-
Flood ProjectFlood study
Flood Study for Mungindi
CompletedPublication date: 18/03/2004This report provides the Flood Study component of the floodplain risk management process and details the investigation of flood behaviour associated with the ‘urban’ area of...
-
Flood ProjectGuidance, Tools and Resources
Brewarrina Shire Local Flood Plan
CompletedPublication date: 01/02/2004This plan covers preparedness measures, the conduct of response operations and the coordination of immediate recovery measures from flooding within the Brewarrina Shire Council...
-
Flood ProjectFlood study
Coonamble Flood Scoping Study
CompletedPublication date: 01/12/2002This study was commissioned by the Department of Land and Water Conservation (DLWC) to review the issues associated with flooding at Coonamble, NSW. It is funded through...
-
Flood ProjectFlood study
Macquarie River Floodplain Management Study (Narromine to Oxley Station) -...
CompletedPublication date: 01/09/2002The objective of the study is to assist the community to co-ordinate floodplain development in order to minimise flood risk to occupiers and users of the floodplain whilst...
-
Flood ProjectFloodplain Risk Management Study
Macquarie Floodplain Management Study - Phase A Report - Environmental Section Draft
CompletedPublication date: 01/05/2002As part of the study commissioned by the Department of Land and Water Conservation (DLWC) and the Macquarie Rural Floodplain Management Committee, a collation of environmental...
-
Flood ProjectFloodplain Risk Management Plan
Mooki River Floodplain Management Plan - Environmental Assessment
CompletedPublication date: 26/06/2001The Mooki River is a tributary of the Namoi River, which is a tributary of the Barwon River, which is a tributary of the Murray/Darling River. The study area covers the right...
-
Flood ProjectGuidance, Tools and Resources
Barwon-Darling River Floodplain Management - Walgett to Bourke - Final...
CompletedPublication date: 01/01/2001This scoping study has been undertaken with the following aims: to collate available data on flood behaviour, existing development, and significant flood dependent ecosystems on...
-
Flood ProjectGuidance, Tools and Resources
Barwon-Darling River - Walgett to Bourke - Floodplain Management - Working...
CompletedPublication date: 01/12/1999A review of current rural floodplain management practice in New South Wales by the Department of Land and Water Conservation (DLWC) has indicated the need for a change in...
-
Flood ProjectVisual Levee Audits
Audit for Flood Levees for NSW - Town of Brewarrina
CompletedPublication date: 01/09/1992The town of Brewarrina situated on the Barwon River in New South Wales has a population of about 1300. It is protected from flooding by a 3km long levee system surrounding the...
-
Flood ProjectVisual Levee Audits
Audit of Flood Levees for New South Wales - Town of Mungindi
CompletedPublication date: 01/05/1992The town of Mungindi on the Barwon River in New South Wales has a population of about 950. It is protected from flooding by a levee system surrounding the town. The total length...
-
Flood ProjectVisual Levee Audits
Audit of Flood Levees for New South Wales - Town of Walgett
CompletedPublication date: 01/04/1992The town of Walgett, which is located on the Namoi River near its confluence with the Barwon River, has a population of about 2,600. It is protected from flooding by a ring...