-
Flood ProjectFloodplain Risk Management Study and Plan
Avalon to Palm Beach Floodplain Risk Management Study and Plan
CompletedPublication date: 20/06/2017The study area comprises a number of catchments in the north of the Pittwater LGA, from Bilgola Beach in the south to Palm Beach in the north. This area includes the Avalon town...
-
Flood ProjectFlood study
Careel Creek Drainage Catchment Flood Study
CompletedPublication date: 23/06/1999A flood study of the Careel Creek Catchment was undertaken to estimate drainage system performance and flood levels for a range of design rainfall events. They were the 20%, 5%...