2 Flood Projects found

Tags: Barrenjoey Road Tasman Sea Careel Creek Pittwater

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Avalon to Palm Beach Floodplain Risk Management Study and Plan

    Completed
    Publication date: 20/06/2017
    The study area comprises a number of catchments in the north of the Pittwater LGA, from Bilgola Beach in the south to Palm Beach in the north. This area includes the Avalon town...

  • Flood Project
    Flood study

    Careel Creek Drainage Catchment Flood Study

    Completed
    Publication date: 23/06/1999
    A flood study of the Careel Creek Catchment was undertaken to estimate drainage system performance and flood levels for a range of design rainfall events. They were the 20%, 5%...