-
Flood ProjectFloodplain Risk Management Study and Plan
Barraba Floodplain Risk Management Study and Plan
CompletedPublication date: 16/02/2018Barraba town is located 90 km to the northwest of Tamworth in the New England region of NSW. The town is located on the Manilla River, which drains to Split Rock Dam and the...
-
Flood ProjectFlood study
Barraba Flood Study
CompletedPublication date: 01/04/2012The upper catchments of the Manilla River are located to the northwest of Tamworth in the New England region of the NSW. The river drains a large (771 square kilometres)...