Flood ProjectFlood study
Albury Floodplain Risk Management Study and Plan
CompletedPublication date: 31/03/2016The study area is defined by the Albury Local Government Area and contains the regional city of Albury and its outer suburbs. The city developed as a major transport link...
-
Flood ProjectFlood study
Eight Mile Creek Flood Study
CompletedPublication date: 09/03/2012The City of Albury is located on the River Murray approximately 600 km south west of Sydney. The catchment of concern is in a future development area to the east of the City....
-
Flood ProjectFlood study
Albury City to Greater Hume Murray River Flood Study
CompletedPublication date: 08/03/2012The towns of Albury and Wodonga are located on the NSW and Victorian sides respectively of the Murray River within the study area. Both towns are growing relatively rapidly in...
-
Flood ProjectFlood study
Murray River Flood Scoping Study
CompletedPublication date: 07/05/2010There have been three major development projects on the Murray River floodplain at Albury / Wodonga since 2000. The three projects are the Hume Freeway Albury Internal Bypass,...
-
Flood ProjectFlood study
Thurgoona Creek and Albury Airport Flood Study
CompletedPublication date: 16/05/2007The Albury Airport catchment is to the east of the Albury CBD and is approximately 3.6 square kilometres in area. The hydraulically modelled drainage path begins downstream of...
-
Flood ProjectFlood study
Lavington Catchment Flood Study (Draft)
CompletedPublication date: 01/11/2005The Lavington catchment (the study area) lies within the Albury City area to the east of the Albury Central Business District. The study area catchment size is approximately 13...
-
Flood ProjectFlood study
Thurgoona Creek and Albury Airport Flood Study (Draft)
CompletedPublication date: 01/09/2005Albury is a regional city which lies on the floodplain of the River Murray at a point several kilometres downstream of Lake Hume. The focus catchment for this study lies two...
-
Flood ProjectReview of Environmental Factors
South Albury Levee Rehabilitation - Statement of Environmental Effects
CompletedPublication date: 01/11/2004The Albury City Council proposes to undertake an upgrade of approximately 60 m of riverbank and levee on an anabranch of the Murray River located to the south of the city...
-
Flood ProjectFloodplain Risk Management Plan
Albury Floodplain Management Plan
CompletedPublication date: 09/01/2003This report describes the methodology used in preparing the FMP for Albury together with recommendations for further studies and works. Background to the study is provided in...
-
Flood ProjectGuidance, Tools and Resources
Albury City - Flooding & Flood Mitigation Studies
CompletedPublication date: 01/09/1984"By letter of 5th April 1983 the Water Resources Commission engaged Gutteridge, Ilaskins & Davey to prepare a flood inundation map for the City of Albury. Albury is...