14 Flood Projects found

Tags: Albury River Basin: 409 - Murray Riverina

Filter Results
  • Flood Project
    Geotech Report on levee

    South Albury Levee Upgrade and Feasibility

    Completed
    Publication date: 21/08/2018
    The Albury City Floodplain Risk Management Study and Plan was adopted by Council in February 2016. One of the key recommendations from the Plan is that a feasibility study of an...

  • Flood Project
    Flood study

    Albury Floodplain Risk Management Study and Plan

    Completed
    Publication date: 31/03/2016
    The study area is defined by the Albury Local Government Area and contains the regional city of Albury and its outer suburbs. The city developed as a major transport link...

  • Flood Project
    Flood study

    Eight Mile Creek Flood Study

    Completed
    Publication date: 09/03/2012
    The City of Albury is located on the River Murray approximately 600 km south west of Sydney. The catchment of concern is in a future development area to the east of the City....

  • Flood Project
    Flood study

    Albury City to Greater Hume Murray River Flood Study

    Completed
    Publication date: 08/03/2012
    The towns of Albury and Wodonga are located on the NSW and Victorian sides respectively of the Murray River within the study area. Both towns are growing relatively rapidly in...

  • Flood Project
    Flood study

    Bungambrawatha Creek, Lavington, South Albury and West Albury Flood Study

    Completed
    Publication date: 01/09/2011
    The study objective was to define flood behaviour in the catchments of Bungambrawatha Creek, Lavington, South Albury and West Albury for flood frequencies ranging between 5 and...

  • Flood Project
    Flood study

    Murray River Flood Scoping Study

    Completed
    Publication date: 07/05/2010
    There have been three major development projects on the Murray River floodplain at Albury / Wodonga since 2000. The three projects are the Hume Freeway Albury Internal Bypass,...

  • Flood Project
    Guidance, Tools and Resources

    Adaptive Environmental Water Use in the NSW Murray Valley 2004-2008

    Completed
    Publication date: 01/12/2008
    The NSW Murray Wetlands Working Group Inc. has managed an Adaptive Environmental Water allocation of up to 32,000 megalitres within the Murray Valley of New South Wales since...

  • Flood Project
    Flood study

    Thurgoona Creek and Albury Airport Flood Study

    Completed
    Publication date: 16/05/2007
    The Albury Airport catchment is to the east of the Albury CBD and is approximately 3.6 square kilometres in area. The hydraulically modelled drainage path begins downstream of...

  • Flood Project
    Guidance, Tools and Resources

    River Murray - Floodplain Inundation Model (RiM-FIM) - Hume Dam to Wellington

    Completed
    Publication date: 01/01/2006
    The River Murray Floodplain Inundation Model (RiM-FIM) was created as a research and decision support tool for environmental flow management in the River Murray. The project has...

  • Flood Project
    Flood study

    Lavington Catchment Flood Study (Draft)

    Completed
    Publication date: 01/11/2005
    The Lavington catchment (the study area) lies within the Albury City area to the east of the Albury Central Business District. The study area catchment size is approximately 13...

  • Flood Project
    Flood study

    Thurgoona Creek and Albury Airport Flood Study (Draft)

    Completed
    Publication date: 01/09/2005
    Albury is a regional city which lies on the floodplain of the River Murray at a point several kilometres downstream of Lake Hume. The focus catchment for this study lies two...

  • Flood Project
    Review of Environmental Factors

    South Albury Levee Rehabilitation - Statement of Environmental Effects

    Completed
    Publication date: 01/11/2004
    The Albury City Council proposes to undertake an upgrade of approximately 60 m of riverbank and levee on an anabranch of the Murray River located to the south of the city...

  • Flood Project
    Floodplain Risk Management Plan

    Albury Floodplain Management Plan

    Completed
    Publication date: 09/01/2003
    This report describes the methodology used in preparing the FMP for Albury together with recommendations for further studies and works. Background to the study is provided in...

  • Flood Project
    Guidance, Tools and Resources

    Albury City - Flooding & Flood Mitigation Studies

    Completed
    Publication date: 01/09/1984
    "By letter of 5th April 1983 the Water Resources Commission engaged Gutteridge, Ilaskins & Davey to prepare a flood inundation map for the City of Albury. Albury is...