54 Flood Projects found

River Basin: 419 - Namoi

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Boggabri Floodplain Risk Management Study and Plan 2024

    Completed
    Publication date: 27/02/2024
    WRM was commissioned by Narrabri Shire Council to prepare the Boggabri Floodplain Risk Management Study and Plan (FRMP). The FRMSP was adopted by NSC in 2024.

  • Flood Project
    Flood study

    Narrabri Floodplain Risk Management Study and Plan 2023

    Completed
    Publication date: 30/05/2023
    WRM was commissioned by Narrabri Shire Council to prepare the Narrabri Floodplain Risk Management Study and Plan (FRMP) . The study included a supplementary Flood Study to...

  • Flood Project
    Flood study

    Boggabri Flood Study - 2021

    Completed
    Publication date: 29/01/2021
    The township of Boggabri is located in the northwest of New South Wales within the Narrabri Shire Council LGA. The township sits at the confluence of the Namoi River and Coxs...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Wee Waa Levee Risk Management Study & Plan

    Completed
    Publication date: 01/12/2019
    Study Objectives Narrabri Shire Council commissioned the Levee Risk Management Study and Plan for the township of Wee Waa. The overall objectives of the Levee Risk Management...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Barraba Floodplain Risk Management Study and Plan

    Completed
    Publication date: 16/02/2018
    Barraba town is located 90 km to the northwest of Tamworth in the New England region of NSW. The town is located on the Manilla River, which drains to Split Rock Dam and the...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Manilla Floodplain Risk Management Study and Draft Plan

    Completed
    Publication date: 13/02/2018
    The upper catchments of the Manilla and Namoi River catchments are located to the northwest of Tamworth in the New England region of NSW. Both rivers drain large catchments...

  • Flood Project
    Floodplain Risk Management Plan

    Bendemeer Floodplain Risk Management Plan

    Completed
    Publication date: 09/08/2016
    Bendemeer is located beside the Macdonald River approximately 42km north-east of Tamworth, along the New England Highway. The catchment has an area of about 1140 square...

  • Flood Project
    Floodplain Risk Management Study

    Bendemeer Floodplain Risk Management Study

    Completed
    Publication date: 08/08/2016
    Bendemeer is located beside the Macdonald River approximately 42km north-east of Tamworth, along the New England Highway. The catchment has an area of about 1140 square...

  • Flood Project
    Flood study

    Narrabri Flood Study Review

    Completed
    Publication date: 01/02/2014
    URS Australia Pty Ltd (URS) was commissioned by Narrabri Shire Council (Council) to upgrade the previously constructed MIKE11 hydraulic model of the Narrabri Creek/Namoi River...

  • Flood Project
    Visual Levee Audits

    Wee Waa Levee Visual Audit

    Completed
    Publication date: 06/11/2013
    Wee Waa is located approximately 30 km West of Narrabri and approximately 430 km Northwest of Sydney. The township is situated on the floodplain of the Namoi River. The Wee Waa...

  • Flood Project
    Floodplain Risk Management Plan

    Lower Coxs Creek Floodplain Management Plan

    Completed
    Publication date: 01/07/2013
    The Lower Coxs Creek floodplain stretches approximately 53 km along the Coxs Creek, from Mullaley to upstream of Boggabri. The nature of flooding across the floodplain has...

  • Flood Project
    Flood study

    Nundle and Woolomin Flood Study and Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/05/2012
    The study area consists of the small township of Nundle and the village of Woolomin within the Tamworth Regional Council Local Government Area. Nundle is located on the right...

  • Flood Project
    Flood study

    Bendemeer Flood Study

    Completed
    Publication date: 25/04/2012
    The subject area is located along the MacDonald River within the town of Bendemeer, situated approximately 40km north-east of Tamworth. The catchment leading to the town of...

  • Flood Project
    Flood study

    Manilla Flood Study

    Completed
    Publication date: 25/04/2012
    The upper catchments of the Manilla and Namoi River catchments are located to the northwest of Tamworth in the New England region of NSW. Both rivers drain large catchments...

  • Flood Project
    Flood study

    Barraba Flood Study

    Completed
    Publication date: 01/04/2012
    The upper catchments of the Manilla River are located to the northwest of Tamworth in the New England region of the NSW. The river drains a large (771 square kilometres)...

  • Flood Project
    Floodplain Risk Management Plan

    Warrah Creek - Floodplain Management Plan

    Completed
    Publication date: 01/02/2012
    The FMP was developed on the basis of a detailed technical analysis of flood flow and in accordance with the NSW Government’s Floodplain Development Manual (2005). The FMP is...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Quirindi Township and Surrounding Area Floodplain Risk Management Study and Plan

    Completed
    Publication date: 10/10/2011
    Quirindi Creek confluences with Jacob and Joseph Creek, downstream of Gurton Street and upstream of Whitaker Street, in the township of Quirindi. During large flood events, the...

  • Flood Project
    Guidance, Tools and Resources

    Namoi Catchment - Water Resources and Management Overview

    Completed
    Publication date: 01/02/2011
    The Namoi River is one of the Murray-Darling Basin's major NSW sub-catch merits. It covers an area of about 42,000 km from the Great Dividing Range near Tamworth to the Barwon...

  • Flood Project
    Post event flood behaviour reports

    Flood Intelligence Collection and Review for the Macdonald, Peel and Namoi Rivers

    Completed
    Publication date: 01/04/2009
    Serious flooding was experienced in the Macdonald, Peel and Namoi River Valleys from 28th to 30th November 2008. The State Emergency Service (SES) is the combat agency for...

  • Flood Project
    Flood study

    Narrabri Bypass Flood Study Progress Report

    Completed
    Publication date: 10/09/2008
    The first stage of a feasibility study into constructing a flood bypass around the eastern side of Narrabri has been completed. A detailed ground survey of the route from the...