29 Flood Projects found

River Basin: 418 - Gwydir

Filter Results
  • Flood Project
    Levee reports

    Moree Flood Management Plan Recommendations Investigation

    Completed
    Publication date: 06/04/2022
    Dryside Engineering (DSE) in partnership with Water Modelling Solutions (WMS) were engaged by Moree Plains Shire Council to undertake and investigate the recommendations from...

  • Flood Project
    Dam Safety Plan

    Dam Safety Emergency Plan (DSEP) Copeton Dam V3.2 November 2021

    Completed
    Publication date: 26/11/2021
    WaterNSW Dam Safety Emergency Plan for Copeton Dam V3.2 November 2021

  • Flood Project
    Flood study

    Moree Flood Management Plan Recommendations Investigation

    Completed
    Publication date: 30/07/2021
    Dryside Engineering in partnership with Water Modelling Solutions were engaged by Moree Plains Shire Council to undertake and investigate the recommendations from the peer...

  • Flood Project
    Dam Safety Plan

    Dam Safety Emergency Plan (DSEP) Copeton Dam V3.1 June 2021

    Completed
    Publication date: 25/06/2021
    WaterNSW Dam Safety Emergency Plan for Copeton Dam V3.1 June 2021

  • Flood Project
    Floodplain Risk Management Study and Plan

    Rowena Flood Study and Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/02/2021
    A flood study and floodplain risk management study has been carried out for the town of Rowena in accordance with the NSW Floodplain Management Program. The study uses the...

  • Flood Project
    Flood study

    Pallamallawa Northern Levee Design Review

    Completed
    Publication date: 12/12/2018
    The Pallamallawa Floodplain Risk Management Study recommended that a levee be constructed around the northern side of the town to reduce the flood risk from the local catchment....

  • Flood Project
    Floodplain Risk Management Study

    Review of Moree and Environs Flood Study/Floodplain RIsk Management Study...

    Completed
    Publication date: 31/05/2017
    This is Volume 2 of the Review of Moree and Environs FS/FRMS&P - which is the Floodplain RIsk Management Study . It should be viewed in conjunction with Volume 1 (Flood...

  • Flood Project
    Flood study

    Review of Moree and Environs Flood Study / Floodplain Risk Management Study...

    Completed
    Publication date: 25/01/2017
    WRM Water & Environment Pty Ltd (WRM) was commissioned by Moree Plains Shire Council (MPSC) to review the Moree and Environs Flood Study/Floodplain Risk Management Study and...

  • Flood Project
    Flood study

    Tingha Flood Study

    Completed
    Publication date: 11/07/2016
    An assessment of flood behaviour in Tingha, which is generally a result of runoff from the Copes Creek catchment and its tributaries. The purpose of this study is to provide...

  • Flood Project
    Flood study

    Rocky and Uralla Creeks Flood Study

    Completed
    Publication date: 23/06/2014
    The Rocky and Uralla Creeks Flood Study has been undertaken to provide flood information for establishment of a floodplain risk management plan for Uralla. The end use of this...

  • Flood Project
    Post event data collection

    Urban Flood Damages Assessment Moree, February 2012 Flood

    Completed
    Publication date: 01/09/2013
    This report deals with investigation into the direct flood damages which occurred to residential properties in Moree during the February 2012 flood. The report has been prepared...

  • Flood Project
    Guidance, Tools and Resources

    Gwydir Valley - Annual Environmental Watering Plan 2012-2013

    Completed
    Publication date: 01/10/2012
    The Gwydir Valley Annual Environmental Watering Plan 2012-13 outlines the objectives and potential actions for environmental water delivery in the Gwydir catchment for the...

  • Flood Project
    Guidance, Tools and Resources

    Gwydir Wetlands - Adaptive Environmental Management Plan

    Completed
    Publication date: 01/02/2011
    The condition of the Gwydir Wetlands has been declining for many years. If this trend is not reversed, the wetlands will cease to exist as a large/ diverse and complex...

  • Flood Project
    Floodplain Risk Management Plan

    Moomin Creek - Floodplain Management Plan

    Completed
    Publication date: 01/10/2010
    The FMP was developed on the basis of a detailed technical analysis of flood flow and in accordance with the NSW Government’s Floodplain Development Manual (2005). The FMP is...

  • Flood Project
    Review of Environmental Factors

    Copeton Dam Safety Upgrade Stage 1: Review of Environmental Factors (Draft)

    Completed
    Publication date: 17/07/2009
    Copeton Dam lies on the Gwydir River 35km south west of Inverell in northern NSW. The dam detains runoff from a 5,360 sq km catchment and releases it to supply town, stock,...

  • Flood Project
    Guidance, Tools and Resources

    Moree Plains - Flood Mapping Atlas

    Completed
    Publication date: 01/03/2007
    Atlas map showcasing the Moree Plans Local Government Area and which parts are inundated, low hazard and high hazard. Flood contours are also visible.

  • Flood Project
    Floodplain Risk Management Study

    Pallamallawa Floodplain Management Study

    Completed
    Publication date: 04/09/2006
    Pallamallawa is situated on the northern bank of the Gwydir River and is subject to flooding from the river. The town is partially protected from Gwydir flooding by a levee that...

  • Flood Project
    Floodplain Risk Management Study

    Moomin Creek Floodplain Management Study

    Completed
    Publication date: 01/05/2006
    This floodplain management study is concerned with the floodplain of Moomin Creek. The FMP area stretches approximately 80 km along Moomin Creek from upstream of the Gurley...

  • Flood Project
    Flood study

    Pallamallawa Flood Study

    Completed
    Publication date: 18/03/2004
    This report provides the Flood Study component of the floodplain risk management process and details the investigation of flood behaviour associated with the ‘urban’ area of the...

  • Flood Project
    Guidance, Tools and Resources

    Pallamallawa - 1% Design Event (Moree Flood Study)

    Completed
    Publication date: 01/09/2003
    Illustrates the peak depths (metres) of the 1% AEP Design Event in Pallamallawa.