-
Flood ProjectFloodplain Risk Management Study and Plan
Emu Creek Floodplain Risk Management Study and Plan (Draft)
CompletedPublication date: 01/10/2011The study area comprises the Emu Creek floodplain within the urban area of Grenfell and its environs. The catchment area of Emu Creek and its tributaries at Holy Camp Road is 20...
-
Flood ProjectFloodplain Risk Management Study
Lachlan River Floodplain Risk Management Study (Gooloogong to Jemalong Gap)
CompletedPublication date: 01/04/2010The study area for the draft FMP incorporates the floodplain area covered by the 1979 Guidelines. It extends from Gooloogong in the east to Jemalong Gap in the Jemalong Range in...
-
Flood ProjectFloodplain Risk Management Study
Review of Eugowra Floodplain Risk Management Study 1999
CompletedPublication date: 01/03/2010The review of the Floodplain Risk Management Study (FRMS) for Eugowra which had been prepared by Lyall and Macoun Consulting Engineers (LMCE, 1999) involved the following...
-
Flood ProjectFloodplain Risk Management Study
Lachlan River Jemalong Gap to Condobolin Floodplain Risk Management Study
CompletedPublication date: 01/05/2009The Crookwell and Abercrombie Rivers are the main tributaries upstream of Wyangala Dam, situated about 16 km southeast of Cowra. Downstream of the dam, the Boorowa and Belubula...
-
Flood ProjectFlood study
Condobolin Flood Study
CompletedPublication date: 01/06/2008Flow patterns in the Lachlan River floodplain are complex, particularly during large flood events. The catchment area to Jemalong Gap is approximately 19,800 square kilometres....
-
Flood ProjectGuidance, Tools and Resources
Hillston Floodplain Levee - Eastern Levee Hydraulic Model Study MIKE 11 Model...
CompletedPublication date: 01/12/2007The NSW Department of Commerce (DoC) was commissioned by the Carrathool Shire Council with assistance from the Department of Environment and Climate Change (DECC formerly the...
-
Flood ProjectFloodplain Risk Management Study and Plan
Canowindra Flood and Floodplain Risk Management Study and Plan (Draft)
CompletedPublication date: 01/10/2007The town of Canowindra is located on the Belubula River, a major tributary of the Lachlan River. The Belubula River rises in high country to the east of Blaney at elevations of...
-
Flood ProjectFlood study
Emu Creek Flood Study
CompletedPublication date: 08/02/2007For the purposes of this study, Emu Creek is assumed to commence at North Street immediately downstream of the junction of Star Gully and Gooloogong Road Tributary. Emu Creek...
-
Flood ProjectVisual Levee Audits
Oxley Levee - Visual Audit of Urban Levees - Non Tidal Areas of NSW
CompletedPublication date: 01/02/2007Oxley is located in southwestern NSW, approximately 820 km west of Sydney. The small town is located beside the Lachlan River and is protected from flooding by a levee system...
-
Flood ProjectFloodplain Risk Management Study
Cowra and Gooloogong Floodplain Risk Management Study and Plan - Volume One
CompletedPublication date: 01/12/2006The town of Cowra is located in the Lachlan Valley, 220 km south-west of Sydney, on the banks of the Lachlan River. The Lachlan River rises in the Great Dividing Range and...
-
Flood ProjectFloodplain Risk Management Plan
Lachlan River - Hillston Floodplain Management Plan - Lake Brewster to Whealb...
CompletedPublication date: 01/10/2005The Hillston Floodplain Management Plan Lake Brewster to Whealbah (FMP) has been prepared by the Department of Natural Resources (DNR) in conjunction with the local community....
-
Flood ProjectFloodplain Risk Management Study
Hillston Floodplain Management Study - Lake Brewster to Whealbah
CompletedPublication date: 01/08/2005The Lachlan and Willandra Creek floodplains around Hillston are regarded as prime agricultural land and support a successful irrigation and dryland farming industry. The...
-
Flood ProjectFloodplain Risk Management Study and Plan
Hillston Floodplain Risk Management Study
CompletedPublication date: 08/06/2005Carrathool Shire Council, through the Hillston Floodplain Management Committee, is developing a floodplain risk management strategy and plan for the town of Hillston. The...
-
Flood ProjectFloodplain Risk Management Study
Hillston Rural Floodplain Management Study
CompletedPublication date: 01/11/2004The document consists of 20 properties and their ecosystem, environmental value rating, practicality rating, as well as a brief overview along with images and an average score....
-
Flood ProjectFlood study
Canowindra Flood Study
CompletedPublication date: 01/02/2004The study area includes the Belubula River and its floodplain from 0.5km upstream of Cherry Tree Falls Bridge on Mandurama Road (MR 7511) to 1km downstream of the former Cowra...
-
Flood ProjectFloodplain Risk Management Study
Lachlan River Floodplain Management Study (Gooloogong to Jemalong Gap) - Phase A
CompletedPublication date: 19/11/2003The study area for the Lachlan Floodplain Management Plan incorporates the floodplain area covered by the existing Guidelines. The study area for the Lachlan Floodplain...
-
Flood ProjectFlood study
Lachlan River (Jemalong Gap to Condobolin) Rural Flood Study
CompletedPublication date: 01/10/2003The lower Lachlan Valley is one of New South Wales' major irrigation developments. The study area for the Lachlan River Floodplain Management Plan extends from Jemalong Gap in...
-
Flood ProjectFloodplain Risk Management Plan
Stockinbingal Floodplain Risk Management Plan
CompletedPublication date: 01/07/2002The village of Stockinbingal is located on the common floodplain of the Dudauman and Bland creeks and, in the past, has been affected by floodwaters from both creeks. The...
-
Flood ProjectFloodplain Risk Management Study
Stockinbingal Floodplain Risk Management Study
CompletedPublication date: 01/07/2002The village of Stockinbingal is located approximately 20 kilometres north west of the town of Cootamundra. It is situated in Cootamundra Shire in the Lachlan River catchment....
-
Flood ProjectReview of Environmental Factors
Hillston Eastern Levee Upgrade - Review of Environmental Factors
CompletedPublication date: 07/12/2001The Department of Commerce has been engaged on behalf of the Carrathool Shire Council to prepare a Review of Environmental Factors (REF) for the proposal to upgrade the Eastern...