-
Flood ProjectConcept Design
Young Stormwater Upgrade Scheme
CompletedPublication date: 01/11/2019This report sets out the findings of an investigation which was undertaken to refine the design of the elements comprising the Combined Trunk Drainage Upgrade Scheme ( the...
-
Flood ProjectFloodplain Risk Management Study and Plan
Boorowa Floodplain Risk Management Study and Plan
CompletedPublication date: 01/03/2018Hilltops Council (Council) commissioned the Floodplain Risk Management Study and Plan for the township of Boorowa. The overall objectives of the Floodplain Risk Management Study...
-
Flood ProjectFlood study
Boorowa Flood Study
CompletedPublication date: 01/03/2017The study objective was to define the nature of both main stream flooding and major overland flow at Boorowa for flood frequencies ranging between 20 and 0.2 per cent Annual...
-
Flood ProjectFloodplain Risk Management Study and Plan
Young Floodplain Risk Management Study and Plan
CompletedPublication date: 01/05/2014Young Shire Council commissioned the Floodplain Risk Management Study and Plan for the town of Young. The overall objectives of the Floodplain Risk Management Study (FRMS) were...
-
Flood ProjectFlood study
The Town of Young Flood Study
CompletedPublication date: 01/03/2014This report presents the results of the investigation of flooding in the Burrangong Creek catchment at Young, which has been prepared for Young Shire Council (YSC) with the...