5 Flood Projects found

River Basin: 412 - Lachlan Organisations: Hilltops Council

Filter Results
  • Flood Project
    Concept Design

    Young Stormwater Upgrade Scheme

    Completed
    Publication date: 01/11/2019
    This report sets out the findings of an investigation which was undertaken to refine the design of the elements comprising the Combined Trunk Drainage Upgrade Scheme ( the...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Boorowa Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/03/2018
    Hilltops Council (Council) commissioned the Floodplain Risk Management Study and Plan for the township of Boorowa. The overall objectives of the Floodplain Risk Management Study...

  • Flood Project
    Flood study

    Boorowa Flood Study

    Completed
    Publication date: 01/03/2017
    The study objective was to define the nature of both main stream flooding and major overland flow at Boorowa for flood frequencies ranging between 20 and 0.2 per cent Annual...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Young Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/05/2014
    Young Shire Council commissioned the Floodplain Risk Management Study and Plan for the town of Young. The overall objectives of the Floodplain Risk Management Study (FRMS) were...

  • Flood Project
    Flood study

    The Town of Young Flood Study

    Completed
    Publication date: 01/03/2014
    This report presents the results of the investigation of flooding in the Burrangong Creek catchment at Young, which has been prepared for Young Shire Council (YSC) with the...