Flood ProjectFloodplain Risk Management Study and Plan
Ariah Park and Springdale Flood Study and Floodplain Risk Management Study and Plan
CompletedPublication date: 01/02/2024Temora Shire Council commissioned the preparation of a flood study and floodplain risk management study and plan for the villages of Ariah Park and Springdale. The overall...
-
Flood ProjectPost event flood behaviour reports
INVESTIGATION OF FLOOD BEHAVIOUR AT EUGOWRA NOVEMBER 2022 FLOOD EVENT
CompletedPublication date: 16/09/2023This report sets out the findings of an investigation that was undertaken on behalf of the NSW Department of Planning and Environment – Environment and Heritage Group (DPE-EHG)...
-
Flood ProjectFlood study
Bimbi Flood Study Final Report Volume 2
CompletedPublication date: 16/03/2023Bimbi Flood Study
-
Flood ProjectFloodplain Risk Management Study
Bimbi Village Flood Risk Management Study and Plan Final Report
CompletedPublication date: 16/03/2023Bimbi is located in the Central West NSW with a population of 114 people, according to the 2016 Australian Bureau of Statistics Census. It predominately consists of rural...
-
Flood ProjectFlood study
Wyalong and West Wyalong Flood Study
CompletedPublication date: 02/02/2023Study Objective The objective of the Wyalong and West Wyalong Flood Study was to define the nature of both Main Stream Flooding and Major Overland Flow at the twin towns of...
-
Flood ProjectFlood Warning Reports
Upper Lachlan Shire Total Flood Warning System
CompletedPublication date: 10/01/2023The overall objective of the project is to design, document, and implement cost effective, fit for purpose flood warning systems for the Villages of Crookwell, Taralga, Gunning,...
-
Flood ProjectFlood study
Bimbi Flood Study Final Report
CompletedPublication date: 07/11/2022Bimbi is located in the Weddin Shire Council Local Government Area (LGA) in Central West NSW. According to the 2016 Australian Bureau of Statistics Census, the suburb of Bimbi...
-
Flood ProjectFlood study
Hillston Flood Risk Management Study and Plan
CompletedPublication date: 01/10/2022The aim of the Floodplain Risk Management Study is to produce information on flood discharges, levels, depths and velocities, for a range of flood events under existing...
-
Flood ProjectFloodplain Risk Management Study and Plan
Ungarie Floodplain Risk Management Study and Plan
CompletedPublication date: 01/06/2020Ungarie has experienced several major historical flood events, including March 2012 and June 2016. To understand and manage flood risk to the town and catchment, council...
-
Flood ProjectFlood study
Forbes Flood Study Review
CompletedPublication date: 01/05/2020The study objectives were to review and update the findings of previous flooding investigations that have been carried out for Forbes. This included the update of flood...
-
Flood ProjectConcept Design
Young Stormwater Upgrade Scheme
CompletedPublication date: 01/11/2019This report sets out the findings of an investigation which was undertaken to refine the design of the elements comprising the Combined Trunk Drainage Upgrade Scheme ( the...
-
Flood ProjectFlood study
Temora Flood Study
CompletedPublication date: 14/06/2019The Temora Flood Study was commissioned by Temora Shire Council and the NSW state government to define the existing flood behaviour in the township of Temora; including the open...
-
Flood ProjectFloodplain Risk Management Study and Plan
Lachlan River (Condobolin) Floodplain Risk Management Study and Plan
CompletedPublication date: 11/11/2018Study Objectives Lachlan Shire Council commissioned the Floodplain Risk Management Study and Draft Plan for the town of Condobolin. The overall objectives of the Floodplain Risk...
-
Flood ProjectFloodplain Risk Management Study and Plan
Boorowa Floodplain Risk Management Study and Plan
CompletedPublication date: 01/03/2018Hilltops Council (Council) commissioned the Floodplain Risk Management Study and Plan for the township of Boorowa. The overall objectives of the Floodplain Risk Management Study...
-
Flood ProjectFlood study
Ungarie Flood Study
CompletedPublication date: 03/05/2017The Ungarie Flood Study has been prepared for Bland Shire Council to define the existing flood behaviour in the township of Ungarie and establish the basis for subsequent...
-
Flood ProjectFlood study
Boorowa Flood Study
CompletedPublication date: 01/03/2017The study objective was to define the nature of both main stream flooding and major overland flow at Boorowa for flood frequencies ranging between 20 and 0.2 per cent Annual...
-
Flood ProjectFloodplain Risk Management Study and Plan
Blayney Floodplain Risk Management Study and Plan
CompletedPublication date: 08/12/2016A Flood Study Report was prepared (Jacobs 2015) to define the flood behaviour for a range of flood events up to and including the probable maximum flood. Community...
-
Flood ProjectFlood study
Blayney Flood Study
CompletedPublication date: 15/06/2015The Town of Blayney is located in the Central West region of New South Wales approximately 240km west of Sydney in the Blayney Shire Council area. Blayney Township (population...
-
Flood ProjectGuidance, Tools and Resources
O'Brien Tributary Drainage Improvements
CompletedPublication date: 01/04/2015Weddin Shire Council issued the Brief for the design of improvements to the stormwater drainage system of the O’Brien Tributary at the Oliver Court residential unit development...
-
Flood ProjectFlood study
Trundle Flood Study
CompletedPublication date: 23/10/2014Trundle is a rural community situated 60km north-west of Parkes in New South Wales. Trundle township experiences frequent flooding from Yarrabandai and Goobang Creeks and...